Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'Belvedere Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR 91 TPK(OKEECH BV INT)' (1)
'Belvede to NB I-95' (1) ·
'EB US 98 SR 80 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR91 SB TPK 100.15' (1) ·
'WB US 98 SR 80 ' (1)
930142 (1) ·
930462 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930484 (1) ·
930485 (1) ·
930486 (1) ·
930487 (1) ·
930530 (1) ·
930531 (1) ·
930539 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)