Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'Burns Road ' (1) ·
'CYPRESS CREEK ' (1) ·
'EARMAN RIVER CANAL C-17 ' (1) ·
'EPB CANAL C-3 ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Holly Drive ' (1) ·
'I 95 SR 9 ' (1) ·
'Loxahatchee Slough ' (1) ·
'LWDD C-17 CANAL ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RETENTION POND ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR786 I95 I95 Ramps ' (1) ·
'Thompson River ' (1)
'ALLAMANDA BLVD. ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'DYER PARK ROAD ' (1) ·
'HOLLY DRIVE ' (1) ·
'Hood Road ' (1) ·
'I-95 (SR 9) ' (1) ·
'LARCH AVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MAC ARTHUR BLVD ' (1) ·
'Military Trail ' (1) ·
'MONET ROAD ' (1) ·
'N. LAKE BLVD EB ' (1) ·
'N. LAKE BLVD WB ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'PGA Blvd (SR786) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'PROS. FARMS ROAD ' (1) ·
'PROSPERITY FARM RD' (1) ·
'PROSPERITY FARMSRD' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR786 WB to SB I95' (1)
930265 (1) ·
930267 (1) ·
930268 (1) ·
930388 (1) ·
930398 (1) ·
930517 (1) ·
930518 (1) ·
930521 (1) ·
930557 (1) ·
934128 (1) ·
934129 (1) ·
934135 (1) ·
934137 (1) ·
934138 (1) ·
934139 (1) ·
934140 (1) ·
934148 (1) ·
934149 (1) ·
936551 (1) ·
937000 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1) ·
937007 (1)
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'Tpk/PGA Blvd interchange ' (1)
26470845 (1) ·
26482992 (1) ·
26483050 (1) ·
26483417 (1) ·
26483495 (1) ·
26490130 (1) ·
26490539 (1) ·
26492346 (1) ·
26492500 (1) ·
26494457 (1) ·
26494723 (1) ·
26494986 (1) ·
26495114 (1) ·
26500997 (1) ·
26501410 (1) ·
26501416 (1) ·
26502106 (1) ·
26502490 (1) ·
26502600 (1) ·
26512989 (1) ·
26515340 (1) ·
26524856 (1) ·
26525635 (1) ·
26525705 (1)
80040825 (1) ·
80041852 (1) ·
80042035 (1) ·
80043160 (1) ·
80043826 (1) ·
80043939 (1) ·
80043945 (1) ·
80050893 (1) ·
80050894 (1) ·
80051210 (1) ·
80052354 (1) ·
80053044 (1) ·
80054982 (1) ·
80055200 (1) ·
80055205 (1) ·
80060970 (1) ·
80061936 (1) ·
80062177 (1) ·
80070400 (1) ·
80071351 (1) ·
80074689 (1) ·
80075215 (1) ·
80075217 (1) ·
80102860 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)