Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930026 (1) ·
930064 (1) ·
930240 (1) ·
930322 (1) ·
930444 (1) ·
930445 (1) ·
934470 (1) ·
934911 (1) ·
935501 (1) ·
935502 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.2 MI W OF LINDELL BLVD ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3MI E OF US-1 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.85 mile South of Linton' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1MI S OF LINTON BLVD ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'Between SR-A1A & SR-5 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)