Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Place 004: Delray Beach & Scour 113 : Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures or Bridge not over waterway.

Use the filters below to narrow your results.

Status:
Date:
County 003:
Place 004: (Click arrow to add another value)
Route 005d:
Direction 005e:
Critical 006b:
Owner 022:
Built 027:
Lanes 028a:
2 (1) · 4 (1) · 5 (1) · 6 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
Width 052:
Deck 058:
Superstructure 059:
Substructure 060:
Channel 061:
Culvert 062:
Inspect Date 090:
Direction 102:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 11 results in range #1 to #11.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)