Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C.S.X. R/R ' (1) ·
'CANAL E-4 ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'CSX Railroad ' (1) ·
'CSX RR ' (1) ·
'E-3 CANAL ' (1) ·
'E-4 Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE IDA CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'None ' (1) ·
'QUAIL COVEY ROAD ' (1)
'E Gateway Blvd ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'MISSION HILL ROAD ' (1) ·
'NB I 95 to Gateway' (1) ·
'Old Boynton Road ' (1) ·
'S. LAKE DRIVE ' (1) ·
'SR 804 ' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SR91 N/S TPK 87.74' (1) ·
'SW 22ND WAY ' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'SW 23RD AVE. ' (1) ·
'Woolbright Road ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
930289 (1) ·
930300 (1) ·
930301 (1) ·
930302 (1) ·
930303 (1) ·
930304 (1) ·
930370 (1) ·
930433 (1) ·
930434 (1) ·
930435 (1) ·
931010 (1) ·
934468 (1) ·
934469 (1) ·
934913 (1) ·
934948 (1) ·
934951 (1) ·
934981 (1) ·
935303 (1) ·
935305 (1) ·
935306 (1)
'0.25 MI. W OF I-95 ' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.7 MI NORTH OF SR-804 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'I 95 Exit 56 ' (1) ·
'Just West of I 95 ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'W of I 95 on Woolbright ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.