Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'C-104 CANAL ' (1) ·
'C-24 Canal ' (1) ·
'CANAL C-104 ' (1) ·
'CANAL C-108 ' (1) ·
'CANAL C-24 ' (1) ·
'CANAL C-73 ' (1) ·
'CANAL E-105 ' (1) ·
'CANAL E-106 ' (1) ·
'CANAL E-114 ' (1) ·
'CANAL E-12/E-84 ' (1) ·
'CANAL E-14 ' (1) ·
'CANAL E-8 ' (1) ·
'CANAL E-84 ' (1) ·
'DRAINAGE CANAL ' (1) ·
'DRAINAGE DITCH ' (1) ·
'ELKCAM CANAL ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FORK OF ST. LUCIE RIVER ' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'HOWARD CREEK ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'MONTERREY WATERWAY ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'ST. LUCIE RIVER ' (1)
'AIROSO BLVD. ' (1) ·
'Becker Rd. ' (1) ·
'Becker Road ' (1) ·
'COLUMBUS DR. ' (1) ·
'Crosstown Parkway ' (1) ·
'DARWIN BLVD ' (1) ·
'DUNN ROAD ' (1) ·
'FLORESTA DR ' (1) ·
'GETTYSBURG DR ' (1) ·
'JEANNE AVE ' (1) ·
'JORGENSEN RD ' (1) ·
'KESTOR DR ' (1) ·
'NORTH MACEDO BLVD ' (1) ·
'NORTH QUICK CIRCLE' (1) ·
'PAAR DR ' (1) ·
'PAAR DR. ' (1) ·
'PEACHTREE BLVD. ' (1) ·
'PORT ST LUCIE BLVD' (1) ·
'PRIMA VISTA BLVD. ' (1) ·
'SAVAGE BLVD. ' (1) ·
'SAVONA BLVD. ' (1) ·
'SELVITZ RD. ' (1) ·
'SELVITZ ROAD ' (1) ·
'SOUTH BEND BLVD. ' (1) ·
'SR91 N/S TPK 139.7' (1) ·
'SR91 N/S TPK 147.7' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 NB TPK 144.6 ' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 144.6 ' (1) ·
'ST LUCIE W BLVD EB' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'UNDALLO RD ' (1) ·
'WESTMORELAND BLVD ' (1)
Number 008:
Location 009:
Latitude 016:
Longitude 017:
101 (1) ·
110 (1) ·
1120 (1) ·
11300 (1) ·
115 (1) ·
120 (1) ·
1200 (1) ·
1500 (1) ·
16600 (1) ·
1700 (1) ·
17500 (1) ·
17700 (1) ·
1800 (1) ·
18100 (1) ·
20000 (1) ·
20150 (1) ·
220 (1) ·
24317 (1) ·
24900 (1) ·
250 (1) ·
3000 (1) ·
3600 (1) ·
40300 (1) ·
48633 (1) ·
500 (1) ·
600 (1) ·
6000 (1) ·
8000 (1) ·
8800 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 41 results in range #1 to #41.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch