Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ARCHIES CREEK ' (1) ·
'C-51 Canal ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Canal C-51 ' (1) ·
'CYPRESS CREEK ' (1) ·
'E-1 Canal ' (1) ·
'EARMAN RIVER CANAL C-17 ' (1) ·
'EPB CANAL C-3 ' (1) ·
'Golf Cart Underpass ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'RCA CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'RETENTION POND ' (1) ·
'SCOTTS CANAL ' (1) ·
'SR 91 TPK ' (1)
'ALLAMANDA BLVD. ' (1) ·
'BIG BLUE TRACE ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'Central Blvd ' (1) ·
'Central Blvd. ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'DYER PARK ROAD ' (1) ·
'FLYING COW ROAD ' (1) ·
'HOLLY DRIVE ' (1) ·
'HOOD RD 110.944 ' (1) ·
'Hood Road ' (1) ·
'Investment Lane ' (1) ·
'LARCH AVE ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'LittleRanchesTrail' (1) ·
'MAC ARTHUR BLVD ' (1) ·
'MONET ROAD ' (1) ·
'OUSLEY FARMS ROAD ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'PROSPERITY FARM RD' (1) ·
'PROSPERITY FARMSRD' (1) ·
'Stribling Way ' (1)
930379 (1) ·
930398 (1) ·
930441 (1) ·
934128 (1) ·
934129 (1) ·
934135 (1) ·
934137 (1) ·
934139 (1) ·
934140 (1) ·
934162 (1) ·
934175 (1) ·
934212 (1) ·
934292 (1) ·
934293 (1) ·
934299 (1) ·
934301 (1) ·
935920 (1) ·
936551 (1) ·
937000 (1) ·
937001 (1) ·
937002 (1) ·
937003 (1) ·
937007 (1)
'0.1 MI S of LIGHTHOUSE DR' (1) ·
'0.10 MI S of BURNS ROAD ' (1) ·
'0.1MI W of HAVERHILL RD. ' (1) ·
'0.1MI W OF MILITARY TRAIL' (1) ·
'0.2MI E OF PROSPERITY FM ' (1) ·
'0.2MI S OF DONALD ROSS ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.3Mi W of Alt-A1A/SR-811' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.9 MILE N OF PGA BLVD. ' (1) ·
'0.95 MI N of PGA Blvd. ' (1) ·
'1 mile North of SR 786 ' (1) ·
'1.1MI W OF US-1 ' (1) ·
'1.5 mile North of SR 786 ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'AT SR-80 ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'At US-441 Southern Blvd ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'South Side of US-98 ' (1) ·
'StriblingWay ovr E-1canal' (1)
26380939 (1) ·
26405072 (1) ·
26405365 (1) ·
26405650 (1) ·
26405713 (1) ·
26405799 (1) ·
26470845 (1) ·
26475245 (1) ·
26490130 (1) ·
26490539 (1) ·
26492346 (1) ·
26494723 (1) ·
26500997 (1) ·
26501410 (1) ·
26501416 (1) ·
26510969 (1) ·
26512802 (1) ·
26512989 (1) ·
26515340 (1) ·
26515528 (1) ·
26524856 (1) ·
26525635 (1) ·
26525705 (1)
80040825 (1) ·
80041852 (1) ·
80042035 (1) ·
80043160 (1) ·
80043826 (1) ·
80043939 (1) ·
80043945 (1) ·
80051210 (1) ·
80052354 (1) ·
80053044 (1) ·
80055517 (1) ·
80062177 (1) ·
80064901 (1) ·
80070400 (1) ·
80070800 (1) ·
80071351 (1) ·
80074430 (1) ·
80121322 (1) ·
80134871 (1) ·
80153155 (1) ·
80170170 (1) ·
80172828 (1) ·
80175381 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.