Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-37 Canal ' (1) ·
'Canal C-46 ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'COLLIER CREEK ' (1) ·
'COLLIER WATERWAY ' (1) ·
'ELKCAM WATERWAY ' (1) ·
'F.E.C. Railroad ' (1) ·
'I-95 ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'St. Sebastian River ' (1) ·
'Tillman Canal ' (1) ·
'Turkey Creek ' (1)
'Americana Blvd. ' (1) ·
'Aviation Ave. ' (1) ·
'BARBER STREET ' (1) ·
'Brittan Avenue ' (1) ·
'Caballero Ave ' (1) ·
'CR-516 ' (1) ·
'Eldron Blvd ' (1) ·
'Eldron Blvd. ' (1) ·
'Emerson Drive ' (1) ·
'ENGLAR DRIVE ' (1) ·
'Jupiter Blvd. ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'Minton Road CR-509' (1) ·
'Palm Bay Library ' (1) ·
'PERIWINKLE DRIVE ' (1) ·
'Port Malabar Bl EB' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR-507 NB ' (1)
700185 (1) ·
700188 (1) ·
704075 (1) ·
704143 (1) ·
704150 (1) ·
704151 (1) ·
704256 (1) ·
705906 (1) ·
705907 (1) ·
705908 (1) ·
705909 (1) ·
705910 (1) ·
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
705917 (1) ·
705918 (1) ·
705953 (1) ·
884078 (1) ·
884079 (1) ·
885601 (1) ·
885602 (1) ·
885603 (1) ·
885605 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1.8MI N OF CR 510 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'10ft. E of Minton Road ' (1) ·
'150FT N OF JOYHAVEN DR ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'CR-516 over I-95 ' (1) ·
'Minton Road-I-95 ' (1) ·
'SR-507 NB - Tillman Canal' (1)
27453074 (1) ·
27455347 (1) ·
27461012 (1) ·
27461070 (1) ·
27464133 (1) ·
27475995 (1) ·
27581117 (1) ·
27583729 (1) ·
27583761 (1) ·
27590343 (1) ·
27590359 (1) ·
27594683 (1) ·
27595668 (1) ·
28002252 (1) ·
28002288 (1) ·
28003971 (1) ·
28004740 (1) ·
28004758 (1) ·
28004888 (1) ·
28004932 (1) ·
28010115 (1) ·
28020728 (1) ·
28025656 (1) ·
28031126 (1) ·
28031144 (1)
80283504 (1) ·
80284214 (1) ·
80290638 (1) ·
80293742 (1) ·
80302066 (1) ·
80302110 (1) ·
80353497 (1) ·
80353508 (1) ·
80354573 (1) ·
80371970 (1) ·
80384417 (1) ·
80392393 (1) ·
80393940 (1) ·
80394165 (1) ·
80394182 (1) ·
80394642 (1) ·
80400209 (1) ·
80400429 (1) ·
80401484 (1) ·
80401656 (1) ·
80401747 (1) ·
80401795 (1) ·
80401800 (1) ·
80401977 (1) ·
80414817 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)