Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-37 Canal ' (1) ·
'Canal C-46 ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'F.E.C. Railroad ' (1) ·
'I-95 ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'OKEECHOBEE BLVD ' (1) ·
'Tillman Canal ' (1) ·
'Turkey Creek ' (1)
'Americana Blvd. ' (1) ·
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'Aviation Ave. ' (1) ·
'Babcock St(CR-507)' (1) ·
'Brittan Avenue ' (1) ·
'Caballero Ave ' (1) ·
'CR-516 ' (1) ·
'Eldron Blvd ' (1) ·
'Eldron Blvd. ' (1) ·
'Emerson Drive ' (1) ·
'IBIS WAY ' (1) ·
'Jupiter Blvd. ' (1) ·
'Jupiter Boulevard ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'Minton Road CR-509' (1) ·
'Palm Bay Library ' (1) ·
'Port Malabar Bl EB' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SR-507 NB ' (1)
700160 (1) ·
700185 (1) ·
700188 (1) ·
704075 (1) ·
704143 (1) ·
704150 (1) ·
704151 (1) ·
704256 (1) ·
705906 (1) ·
705907 (1) ·
705908 (1) ·
705909 (1) ·
705910 (1) ·
705913 (1) ·
705914 (1) ·
705915 (1) ·
705916 (1) ·
705917 (1) ·
705918 (1) ·
705923 (1) ·
705953 (1) ·
934275 (1) ·
934276 (1) ·
936801 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.1MI WEST OF A1A ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'10ft. E of Minton Road ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'At Minton Rd. Intersectn ' (1) ·
'Babcock Street over I-95 ' (1) ·
'CR-516 over I-95 ' (1) ·
'Minton Road-I-95 ' (1) ·
'SR-507 NB - Tillman Canal' (1)
26382089 (1) ·
26422060 (1) ·
26422066 (1) ·
27581117 (1) ·
27583729 (1) ·
27583761 (1) ·
27590343 (1) ·
27590359 (1) ·
27591190 (1) ·
27591500 (1) ·
27594683 (1) ·
27595668 (1) ·
28002252 (1) ·
28002288 (1) ·
28003971 (1) ·
28004740 (1) ·
28004758 (1) ·
28004888 (1) ·
28004932 (1) ·
28010115 (1) ·
28020728 (1) ·
28025656 (1) ·
28031126 (1) ·
28031144 (1)
80022643 (1) ·
80035653 (1) ·
80035730 (1) ·
80353497 (1) ·
80353508 (1) ·
80354573 (1) ·
80371922 (1) ·
80371970 (1) ·
80384417 (1) ·
80392393 (1) ·
80393940 (1) ·
80394165 (1) ·
80394182 (1) ·
80394642 (1) ·
80400209 (1) ·
80400429 (1) ·
80401484 (1) ·
80401656 (1) ·
80401747 (1) ·
80401795 (1) ·
80401800 (1) ·
80401977 (1) ·
80414817 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)