Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Babcock St(CR-507)' (1) ·
'Caballero Ave ' (1) ·
'CR-516 ' (1) ·
'EB North Lake Blvd' (1) ·
'Eldron Blvd ' (1) ·
'Eldron Blvd. ' (1) ·
'Jupiter Blvd. ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'Minton Rd. ' (1) ·
'Port Malabar Bl EB' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SR-A1A ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB N. Lake Blvd. ' (1)
700160 (1) ·
700188 (1) ·
704143 (1) ·
704150 (1) ·
704151 (1) ·
705907 (1) ·
705909 (1) ·
705910 (1) ·
705913 (1) ·
705916 (1) ·
705917 (1) ·
930003 (1) ·
930050 (1) ·
930195 (1) ·
930361 (1) ·
936550 (1)
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'A1A on Singer Island ' (1) ·
'Babcock Street over I-95 ' (1) ·
'CR-516 over I-95 ' (1) ·
'Just North of SR-850 ' (1) ·
'Minton Road-I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)