Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOBWHITE ROAD ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'GOLDFINCH LANE ' (1) ·
'GRANDVIEW WAY ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'PONCE DE LEON ST ' (1) ·
'RAVEN COURT ' (1) ·
'ROYAL PALM BCH BLV' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SPARROW DRIVE ' (1) ·
'SR-44 ' (1) ·
'US-98 (SR-80) ' (1)
790172 (1) ·
930402 (1) ·
934220 (1) ·
937350 (1) ·
937351 (1) ·
937352 (1) ·
937353 (1) ·
937354 (1) ·
937355 (1) ·
937356 (1) ·
937357 (1) ·
937358 (1) ·
937359 (1) ·
937360 (1) ·
937361 (1) ·
937362 (1) ·
937363 (1) ·
937366 (1) ·
937367 (1)
'0.03MI W OF DOVE CIRCLE ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.8MI N OF SR 80 ' (1) ·
'1.3MI N OF SR-80 ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'4 miles west of SR 7 ' (1) ·
'SR-44 - Indian River ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)