Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12122 (1) ·
12126 (1) ·
12127 (1) ·
12177 (1) ·
12178 (1) ·
12180 (1) ·
12181 (1) ·
12205 (1) ·
12237 (1) ·
12251 (1) ·
12252 (1) ·
12253 (1) ·
12254 (1) ·
13661 (1) ·
13703 (1) ·
13745 (1) ·
13746 (1) ·
13816 (1) ·
13817 (1) ·
17855 (1) ·
17861 (1) ·
17865 (1) ·
17877 (1) ·
18727 (1) ·
18728 (1) ·
18741 (1) ·
18742 (1) ·
18780 (1) ·
18781 (1)
'Banana River ' (1) ·
'Banana River Drive ' (1) ·
'Banana River Relief ' (1) ·
'Banana River Relief West' (1) ·
'Barge Canal ' (1) ·
'Canal ' (1) ·
'Indian River ' (1) ·
'Nav. Banana River Canal ' (1) ·
'Nova Canal ' (1) ·
'Reed Canal ' (1) ·
'SR-3 ' (1) ·
'Sykes Creek ' (1) ·
'Tomoka River ' (1) ·
'Turnbull Creek ' (1)
'Girard Blvd. ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Lantern Park Drive' (1) ·
'Oak Lea Drive ' (1) ·
'Patti Drive ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'Richland Ave ' (1) ·
'Saul Street ' (1) ·
'SR-3 ' (1) ·
'SR-404 EB ' (1) ·
'SR-520 ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-5A ' (1) ·
'Sykes Creek Pkwy ' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1)
700017 (1) ·
700026 (1) ·
700027 (1) ·
700072 (1) ·
700110 (1) ·
700111 (1) ·
700113 (1) ·
700114 (1) ·
700146 (1) ·
700193 (1) ·
700201 (1) ·
700208 (1) ·
700221 (1) ·
704011 (1) ·
704013 (1) ·
704016 (1) ·
704017 (1) ·
790012 (1) ·
790086 (1) ·
790177 (1) ·
790178 (1) ·
790183 (1) ·
790184 (1) ·
790201 (1) ·
790202 (1) ·
796500 (1) ·
796518 (1) ·
796548 (1) ·
796549 (1)
'.8 Mile North of SR-520 ' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.4 Mi. S. of Beville Rd ' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'10ft. S/O Reed Canal Rd ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'At Reed Canal Road ' (1) ·
'CR-4078 & Lantern Park Dr' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'SR-528 WB over SR-3 ' (1) ·
'SR-5A over Nova Canal ' (1) ·
'SR-5A over Nova Canal ' (1) ·
'US-1 NB - Turnbull Creek ' (1) ·
'US-1 over Reed Canal ' (1)
28123224 (1) ·
28212603 (1) ·
28212680 (1) ·
28220616 (1) ·
28220892 (1) ·
28233806 (1) ·
28240920 (1) ·
28241003 (1) ·
28241813 (1) ·
28241822 (1) ·
28241870 (1) ·
28241877 (1) ·
28241880 (1) ·
28241933 (1) ·
28242777 (1) ·
28242782 (1) ·
28293415 (1) ·
28491441 (1) ·
29090099 (1) ·
29090120 (1) ·
29091610 (1) ·
29092052 (1) ·
29092945 (1) ·
29093016 (1) ·
29093020 (1) ·
29093065 (1) ·
29093945 (1) ·
29101368 (1) ·
29102421 (1)
80380201 (1) ·
80393043 (1) ·
80393049 (1) ·
80393654 (1) ·
80394904 (1) ·
80394909 (1) ·
80401219 (1) ·
80404702 (1) ·
80405551 (1) ·
80413508 (1) ·
80422075 (1) ·
80422081 (1) ·
80422088 (1) ·
80422154 (1) ·
80425652 (1) ·
80440500 (1) ·
80440519 (1) ·
80513571 (1) ·
80594278 (1) ·
81001126 (1) ·
81002450 (1) ·
81003691 (1) ·
81005885 (1) ·
81011090 (1) ·
81012273 (1) ·
81013312 (1) ·
81013879 (1) ·
81051410 (1) ·
81051478 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
N/A (1) ·
No deficiencies (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 29 results in range #1 to #29.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)