Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'CHENEY WAY/CSX RR ' (1) ·
'Drainage Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'Lake Worth Relief ' (1) ·
'Sebastian Canal ' (1) ·
'Sebastian Canal East ' (1) ·
'SR 708 (Blue Heron Blvd)' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR-518 ' (1) ·
'US-192 ' (1) ·
Canal (1) ·
I-95 (1) ·
Sebastian River (1)
'Blue Heron Blvd ' (1) ·
'Blue Heron Blvd. ' (1) ·
'CONGRESS AVE (NB) ' (1) ·
'CONGRESS AVE (SB) ' (1) ·
'EB Blue Heron Blvd' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Micco Rd. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 710 ' (1) ·
'SR A1A ' (1) ·
'WB Blue Heron Blvd' (1) ·
'Wilden Road ' (1) ·
Micco Rd. (1) ·
US-1 (1)
700122 (1) ·
700157 (1) ·
700165 (1) ·
700209 (1) ·
700224 (1) ·
700941 (1) ·
704035 (1) ·
704085 (1) ·
930172 (1) ·
930173 (1) ·
930269 (1) ·
930467 (1) ·
930468 (1) ·
930519 (1) ·
930523 (1) ·
930534 (1) ·
930545 (1) ·
934155 (1) ·
934156 (1)
'0.1 mi W of Fleming Grant' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.5MI N OF 45TH STREET ' (1) ·
'0.5mi. East of US-1 ' (1) ·
'0.6mi East of Congress Av' (1) ·
'0.75 mile South of SR 708' (1) ·
'1 Mile East of I-95 ' (1) ·
'2 mi West of US-1 ' (1) ·
'At Exit 76 ' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 over US-192 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'SR-A1A East of ICWW ' (1) ·
1.9MI E of Babcock St. (1) ·
4.2 Mi N of Sebastian River (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing by assessment, by calculation or by installation of properly designed countermeasures. (1) ·
Bridge not over waterway. (1)
118848 (1) ·
184778 (1) ·
21600 (1) ·
2429 (1) ·
26546 (1) ·
27413 (1) ·
28263 (1) ·
29 (1) ·
32098 (1) ·
34180 (1) ·
3494 (1) ·
369555 (1) ·
64195 (1) ·
71569 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)