Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12122 (1) ·
12126 (1) ·
12127 (1) ·
12177 (1) ·
12178 (1) ·
12180 (1) ·
12181 (1) ·
12186 (1) ·
12205 (1) ·
12237 (1) ·
12248 (1) ·
12251 (1) ·
12252 (1) ·
12253 (1) ·
12254 (1) ·
17855 (1) ·
17861 (1) ·
17865 (1) ·
17866 (1) ·
17869 (1) ·
17870 (1) ·
17871 (1) ·
17872 (1) ·
17877 (1) ·
17893 (1) ·
17907 (1)
'Banana River ' (1) ·
'Banana River Drive ' (1) ·
'Banana River Relief ' (1) ·
'Banana River Relief West' (1) ·
'Barge Canal ' (1) ·
'Canal ' (1) ·
'Drainage Ditch ' (1) ·
'Indian River ' (1) ·
'Nav. Banana River Canal ' (1) ·
'Platt Ranch Access Road ' (1) ·
'SR-3 ' (1) ·
'SR-518 ' (1) ·
'Sykes Creek ' (1) ·
'US-192 ' (1) ·
Sawgrass Creek (1) ·
St Johns River (1) ·
St Johns River Relief (1) ·
St. Johns River (1)
'Girard Blvd. ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Patti Drive ' (1) ·
'Richland Ave ' (1) ·
'SR-3 ' (1) ·
'SR-404 EB ' (1) ·
'SR-520 ' (1) ·
'SR-528 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'St. Johns Heritage' (1) ·
'Sykes Creek Pkwy ' (1) ·
'Willowood Drive ' (1) ·
US-192 EB (1) ·
US-192 WB (1)
700017 (1) ·
700026 (1) ·
700027 (1) ·
700072 (1) ·
700110 (1) ·
700111 (1) ·
700113 (1) ·
700114 (1) ·
700122 (1) ·
700146 (1) ·
700193 (1) ·
700201 (1) ·
700208 (1) ·
700209 (1) ·
700212 (1) ·
700213 (1) ·
700214 (1) ·
700215 (1) ·
700221 (1) ·
700941 (1) ·
704011 (1) ·
704013 (1) ·
704016 (1) ·
704017 (1) ·
704032 (1) ·
704190 (1)
'.21 E of Minton Rd. ' (1) ·
'.8 Mile North of SR-520 ' (1) ·
'0.1 mi W of Banana Rvr Dr' (1) ·
'0.4 mile East of SR-3 ' (1) ·
'15ft. N of Pine Island Dr' (1) ·
'2.55 Miles East of SR-3 ' (1) ·
'2.85 Miles East of SR-3 ' (1) ·
'2.9 Miles South of US-192' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 over US-192 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'SR-3 NB over Barge Canal ' (1) ·
'SR-3 SB over Barge Canal ' (1) ·
'SR-404 EB-Banana Riv Rel ' (1) ·
'SR-520 - Banana River ' (1) ·
'SR-520 - Sykes Creek ' (1) ·
'SR-528 EB - Indian River ' (1) ·
'SR-528 EB over SR-3 ' (1) ·
'SR-528 WB - Indian River ' (1) ·
'SR-528 WB over SR-3 ' (1) ·
US-192 EB-St Johns Relief (1) ·
US-192 EB-St Johns River (1) ·
US-192 WB - Sawgrass Cr. (1) ·
US-192 WB- St Johns River (1)
28024500 (1) ·
28030000 (1) ·
28044400 (1) ·
28050471 (1) ·
28050547 (1) ·
28052963 (1) ·
28053134 (1) ·
28071404 (1) ·
28123224 (1) ·
28212603 (1) ·
28212680 (1) ·
28220616 (1) ·
28220892 (1) ·
28233806 (1) ·
28240920 (1) ·
28241003 (1) ·
28241813 (1) ·
28241822 (1) ·
28241870 (1) ·
28241877 (1) ·
28241880 (1) ·
28241933 (1) ·
28242777 (1) ·
28242782 (1) ·
28293415 (1)
80380201 (1) ·
80393043 (1) ·
80393049 (1) ·
80393654 (1) ·
80394904 (1) ·
80394909 (1) ·
80400400 (1) ·
80401219 (1) ·
80404702 (1) ·
80405551 (1) ·
80413508 (1) ·
80422075 (1) ·
80422081 (1) ·
80422088 (1) ·
80422093 (1) ·
80422154 (1) ·
80422195 (1) ·
80422199 (1) ·
80425652 (1) ·
80440500 (1) ·
80440519 (1) ·
80448000 (1) ·
80450403 (1) ·
80450449 (1) ·
80454978 (1) ·
80494825 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 26 results in range #1 to #26.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)