Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Burns Road ' (1) ·
'Canal 15 ' (1) ·
'Eau Gallie River ' (1) ·
'Golf Cart Underpass ' (1) ·
'Holly Drive ' (1) ·
'I-95 ' (1) ·
'Indian River IWW ' (1) ·
'Kyoto Gardens Dr ' (1) ·
'Little Lake Worth ' (1) ·
'Loxahatchee Slough ' (1) ·
'Northlake Blvd. ' (1) ·
'RCA Center Dr & FEC R/R ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR-507 ' (1) ·
Horse Creek (1) ·
Lake Washington Road (1)
'Apollo Boulevard ' (1) ·
'Central Blvd. ' (1) ·
'EB SR 786 ' (1) ·
'EB SR-710 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR 9) ' (1) ·
'Investment Lane ' (1) ·
'John Rodes Blvd. ' (1) ·
'NB I-95 (S.R.9) ' (1) ·
'PGA Blvd (SR786) ' (1) ·
'Pineda Causeway ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SR 811 to SB I 95 ' (1) ·
'SR 811 to SB I-95 ' (1) ·
'SR A1A ' (1) ·
'SR-507 ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'US-192 WB ' (1) ·
'WB SR 786 ' (1) ·
'WB SR-710 ' (1) ·
'Wickham Road ' (1) ·
I-95 SB (1) ·
US-1 (1)
700043 (1) ·
700174 (1) ·
700186 (1) ·
700206 (1) ·
700225 (1) ·
704188 (1) ·
704197 (1) ·
705604 (1) ·
930491 (1) ·
930492 (1) ·
930493 (1) ·
930516 (1) ·
930517 (1) ·
930518 (1) ·
930521 (1) ·
930526 (1) ·
930535 (1) ·
930536 (1) ·
930546 (1) ·
930557 (1) ·
931013 (1) ·
934162 (1) ·
934175 (1)
'0.3 mi east of US 1 & PGA' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.95 MI N of PGA Blvd. ' (1) ·
'1.35Mi N of US-192 ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1st overpass east of I-95' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'Apollo Blvd - Eau Gallie ' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Between N Lake/PGA Blvds.' (1) ·
'Between SR 710 and 786 ' (1) ·
'CR-509 .5 Mi N of SR-518 ' (1) ·
'NW quad SR811/786 intchge' (1) ·
'Palm Beach Garden Interch' (1) ·
'SR-507 over Crane Creek ' (1) ·
'US-192 WB-Indian River ' (1) ·
I-95 SB -Lk Washington Rd (1) ·
US-1 over Horse Creek (1)
26475245 (1) ·
26483165 (1) ·
26492016 (1) ·
26492039 (1) ·
26492500 (1) ·
26494986 (1) ·
26495114 (1) ·
26502490 (1) ·
26503600 (1) ·
26503760 (1) ·
26503846 (1) ·
26503900 (1) ·
26504600 (1) ·
26504915 (1) ·
26510969 (1) ·
28040738 (1) ·
28050339 (1) ·
28055660 (1) ·
28073710 (1) ·
28080403 (1) ·
28084584 (1) ·
28100028 (1) ·
28113278 (1)
80032660 (1) ·
80054200 (1) ·
80054600 (1) ·
80054615 (1) ·
80054982 (1) ·
80055200 (1) ·
80055205 (1) ·
80055370 (1) ·
80055517 (1) ·
80070800 (1) ·
80074716 (1) ·
80101483 (1) ·
80101580 (1) ·
80102860 (1) ·
80352988 (1) ·
80371675 (1) ·
80384071 (1) ·
80384610 (1) ·
80401823 (1) ·
80420110 (1) ·
80422180 (1) ·
80422723 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)