Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700034 (1) ·
700075 (1) ·
700076 (1) ·
700119 (1) ·
700141 (1) ·
700142 (1) ·
700162 (1) ·
700202 (1) ·
700204 (1) ·
700205 (1) ·
700226 (1) ·
704004 (1) ·
704042 (1) ·
705500 (1) ·
705919 (1)
.1 Mi E of I-95 (1) ·
'0.6 mi S of Pt Malabar Bl' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.5 Mi. S of SR-514 ' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'I-95 - SR-514 ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'I-95 SB- Tillman Canal ' (1) ·
'SR-404 EB - Indian River ' (1) ·
'SR-404 WB - Indian River ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 NB over Goat Creek ' (1) ·
'US-1 SB - SR-404 ' (1) ·
'US-1 SB over Goat Creek ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)