Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'17th Avenue North ' (1) ·
'C-51 Canal ' (1) ·
'CR 702 45th Street ' (1) ·
'Drainage Canal ' (1) ·
'EPB - 10 Canal ' (1) ·
'Hillsboro Canal ' (1) ·
'I 95 and SR 704 ' (1) ·
'Lake Worth Util Outfall ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'Summit Boulevard ' (1) ·
'SWA Retention Canal ' (1) ·
'WEST PALM BEACH CANAL ' (1) ·
'WPB Drainage Canal ' (1)
'6 Ave S to NB I-95' (1) ·
'Haverhill Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 (SR 9) ' (1) ·
'Jog Road ' (1) ·
'MERCER AVE ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Private Road ' (1) ·
'SB I 95 Off Ramp ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'WB SR704 to SB I95' (1)
930190 (1) ·
930235 (1) ·
930259 (1) ·
930261 (1) ·
930262 (1) ·
930273 (1) ·
930291 (1) ·
930292 (1) ·
930294 (1) ·
930469 (1) ·
930488 (1) ·
930489 (1) ·
930494 (1) ·
930508 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
930520 (1) ·
930540 (1) ·
930812 (1) ·
934158 (1) ·
934171 (1) ·
937708 (1)
'0.25 mi N of Belvedere Rd' (1) ·
'0.3 Mi N of 45th St ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1 mi N Palm Bch Lake Blvd' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.0 Mi E of Nob Hill Road' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'2.6 Mi. S of SR-710 ' (1) ·
'250FT N of BELVEDERE RD ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'800 ft. S of SR 704 Exit ' (1) ·
'At Exit 74 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 / SR 882 ' (1) ·
'I-95 SR 704 interchange ' (1) ·
'Lake Worth ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1) ·
'SB Ramp to WPB Airport ' (1)
26210580 (1) ·
26360600 (1) ·
26363990 (1) ·
26364054 (1) ·
26364900 (1) ·
26381065 (1) ·
26384400 (1) ·
26384575 (1) ·
26391930 (1) ·
26395750 (1) ·
26412955 (1) ·
26413650 (1) ·
26413720 (1) ·
26413785 (1) ·
26420100 (1) ·
26422570 (1) ·
26440030 (1) ·
26450626 (1) ·
26453240 (1) ·
26454160 (1) ·
26455503 (1)
80035422 (1) ·
80040535 (1) ·
80040575 (1) ·
80040600 (1) ·
80040610 (1) ·
80040620 (1) ·
80040685 (1) ·
80040715 (1) ·
80040800 (1) ·
80040830 (1) ·
80040879 (1) ·
80041030 (1) ·
80041431 (1) ·
80041480 (1) ·
80041600 (1) ·
80041855 (1) ·
80043790 (1) ·
80052775 (1) ·
80052810 (1) ·
80065835 (1) ·
80080366 (1) ·
80082890 (1) ·
80165951 (1)
100 (1) ·
10500 (1) ·
113000 (1) ·
114500 (1) ·
11500 (1) ·
115000 (1) ·
116000 (1) ·
13716 (1) ·
190500 (1) ·
213000 (1) ·
222000 (1) ·
226000 (1) ·
236000 (1) ·
3500 (1) ·
5800 (1) ·
6042 (1) ·
68700 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the culvert. Insignificant scrape marks caused by drift. (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
10063 (1) ·
10875 (1) ·
119194 (1) ·
120 (1) ·
18218 (1) ·
196055 (1) ·
198658 (1) ·
19952 (1) ·
199525 (1) ·
201260 (1) ·
20574 (1) ·
330518 (1) ·
369555 (1) ·
385170 (1) ·
392110 (1) ·
409460 (1) ·
6073 (1)
Showing below up to 23 results in range #1 to #23.