Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Inlet ' (1) ·
'C-17 CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL C-17 ' (1) ·
'Earman River (C-17) ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-8 CANAL ' (1) ·
'LAKE CLARKE CHANNEL ' (1) ·
'LWDD CANAL L-9 ' (1) ·
'LWDD L-7 CANAL ' (1) ·
'North Lake ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'Tide Relief Canal ' (1) ·
'WPB Canal (C-51) ' (1)
'EAST OCEAN AVE. ' (1) ·
'EB North Lake Blvd' (1) ·
'Forest Hill Blvd. ' (1) ·
'INLET CAY DR. ' (1) ·
'Island Drive ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MEDITERRANEAN RD ' (1) ·
'PARK AVE. W. ' (1) ·
'PINETREE LANE ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SABLE ISLAND DRIVE' (1) ·
'SR A1A ' (1) ·
'SR-A1A ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB N. Lake Blvd. ' (1) ·
'WEST LAKE DRIVE ' (1)
930003 (1) ·
930004 (1) ·
930050 (1) ·
930061 (1) ·
930195 (1) ·
930361 (1) ·
930446 (1) ·
934116 (1) ·
934164 (1) ·
934347 (1) ·
936261 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1) ·
936550 (1) ·
936654 (1) ·
936655 (1) ·
936656 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.04Mi W OF A1A ' (1) ·
'0.04MI S OF FOREST HILL ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'A1A on Singer Island ' (1) ·
'Just North of SR-850 ' (1) ·
'Just west of I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)