Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'12th Avenue South ' (1) ·
'BRANCH OF ICWW ' (1) ·
'C-18 Canal ' (1) ·
'CSX RR ' (1) ·
'Donald Ross Road ' (1) ·
'I-95 (SR-9) ' (1) ·
'JONES CREEK ' (1) ·
'Jupiter Creek ' (1) ·
'Kellers Canal ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'Loxahatchee River ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'SIMS CREEK ' (1) ·
'SLOUGH ' (1) ·
'SR 706 & I-95/SR706 Ramp' (1) ·
'SR 706 To NB I 95 ' (1) ·
'SR-706 Indiantown Rd. ' (1)
'10th Ave North ' (1) ·
'CENTER STREET ' (1) ·
'I 95 SR 9 ' (1) ·
'Indiantown Rd. ' (1) ·
'Indiantown Road ' (1) ·
'JUPITER BEACH RD ' (1) ·
'KELLER ROAD ' (1) ·
'NB I-95 ( SR-9 ) ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'SB I 95 SR9 ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SB I-95 ( SR-9 ) ' (1) ·
'SR-811 (Alt A-1-A)' (1) ·
'SR802 (Lake Worth)' (1) ·
'WB SR706 to SB 95 ' (1) ·
'WB SR706 to SB I95' (1)
930073 (1) ·
930263 (1) ·
930273 (1) ·
930339 (1) ·
930371 (1) ·
930380 (1) ·
930382 (1) ·
930383 (1) ·
930385 (1) ·
930390 (1) ·
930391 (1) ·
930394 (1) ·
930420 (1) ·
934125 (1) ·
934142 (1) ·
934144 (1) ·
934146 (1) ·
934147 (1) ·
934940 (1) ·
936350 (1)
'.4mi. East of Congress ' (1) ·
'.5 mi East of I-95 ' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.2MI E OF A1A ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.6MI NE OF INDIANTOWN RD' (1) ·
'0.8MI E of INDIANTOWN RD ' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1 mile North of SR 812 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'10th Ave North over I 95 ' (1) ·
'2.3 Mi. East of I-95 ' (1) ·
'City of Jupiter ' (1) ·
'I 95 SR 706 Interchange ' (1) ·
'I 95 SR706 interchange ' (1) ·
'I-95 / Donald Ross Rd ' (1) ·
'I-95 / SR 706 interchange' (1) ·
'SR 706 to I 95 Ramp ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
113642 (1) ·
123619 (1) ·
1500 (1) ·
22070 (1) ·
23423 (1) ·
24290 (1) ·
2500 (1) ·
330518 (1) ·
36435 (1) ·
47249 (1) ·
49448 (1) ·
5205 (1) ·
65930 (1) ·
74605 (1) ·
84148 (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)