Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Inlet ' (1) ·
'C-51 Canal ' (1) ·
'CANAL ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'DRAINAGE CANAL ' (1) ·
'HYPOLUXO ISLAND LAGOON ' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 (SR-9)/CSXRR ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAKE OSBOURNE ' (1) ·
'Lantana Road ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-5 CANAL ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'US 98-SR 80-WPB Canal ' (1)
'BELVEDERE RD EB ' (1) ·
'BELVEDERE RD WB ' (1) ·
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR-812 OCEAN AVE ' (1) ·
'EAST OCEAN AVE. ' (1) ·
'Haverhill Rd ' (1) ·
'Hypoluxo Rd ' (1) ·
'Hypoluxo to SB I95' (1) ·
'INLET CAY DR. ' (1) ·
'Island Drive ' (1) ·
'LANTANA ROAD EB ' (1) ·
'LANTANA ROAD WB ' (1) ·
'Lantana to I 95 SB' (1) ·
'MARGINAL RD ' (1) ·
'SABLE ISLAND DRIVE' (1) ·
'SB I 95 to Lantana' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 812 Lantana Rd ' (1) ·
'SR A1A ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'SR91 SB TPK 91.26 ' (1) ·
'SR91SB ON/OFF 98.0' (1)
930061 (1) ·
930274 (1) ·
930275 (1) ·
930276 (1) ·
930298 (1) ·
930299 (1) ·
930307 (1) ·
930447 (1) ·
931002 (1) ·
931003 (1) ·
931004 (1) ·
931005 (1) ·
934205 (1) ·
934206 (1) ·
934214 (1) ·
934295 (1) ·
934331 (1) ·
934332 (1) ·
934341 (1) ·
934342 (1) ·
934347 (1) ·
934369 (1) ·
936654 (1) ·
936655 (1) ·
936656 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.04Mi W OF A1A ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.3 Mile East of US-1 ' (1) ·
'0.3MI S OF PIONEER RD ' (1) ·
'0.6 MI W OF I-95 ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'1MI W OF SR 809 ' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'2.1MI S LAKEWORTH INTERCH' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'500' N OF SR-80 (S.BLVD) ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd over I 95&RR ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1) ·
'S of Southrn/Haverhll Int' (1)
26315908 (1) ·
26322144 (1) ·
26323521 (1) ·
26324386 (1) ·
26341790 (1) ·
26342000 (1) ·
26342200 (1) ·
26344631 (1) ·
26344632 (1) ·
26350275 (1) ·
26350300 (1) ·
26351210 (1) ·
26351400 (1) ·
26351510 (1) ·
26351567 (1) ·
26351625 (1) ·
26352544 (1) ·
26352545 (1) ·
26401000 (1) ·
26401030 (1) ·
26403896 (1) ·
26404472 (1) ·
26410696 (1) ·
26413242 (1) ·
26413281 (1)
80023162 (1) ·
80023594 (1) ·
80024400 (1) ·
80024595 (1) ·
80024971 (1) ·
80025576 (1) ·
80040850 (1) ·
80041000 (1) ·
80041025 (1) ·
80041140 (1) ·
80041145 (1) ·
80044182 (1) ·
80044190 (1) ·
80052259 (1) ·
80052320 (1) ·
80071317 (1) ·
80074091 (1) ·
80074092 (1) ·
80094590 (1) ·
80095982 (1) ·
80102169 (1) ·
80102377 (1) ·
80102433 (1) ·
80104062 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 25 results in range #1 to #25.