Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12133 (1) ·
12185 (1) ·
12245 (1) ·
12250 (1) ·
12257 (1) ·
12272 (1) ·
12286 (1) ·
13670 (1) ·
13695 (1) ·
13696 (1) ·
13718 (1) ·
13719 (1) ·
13723 (1) ·
13736 (1) ·
13748 (1) ·
13749 (1) ·
13752 (1) ·
13776 (1) ·
13784 (1) ·
13813 (1) ·
15753 (1) ·
17857 (1) ·
17862 (1) ·
17863 (1) ·
18729 (1) ·
18734 (1) ·
19384 (1) ·
19385 (1) ·
19386 (1) ·
19387 (1) ·
19440 (1) ·
19441 (1) ·
19702 (1)
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'Carter's Canal ' (1) ·
'Creek ' (1) ·
'EB SR80 & C-51 Canal ' (1) ·
'Goat Creek ' (1) ·
'Groover Creek ' (1) ·
'Halifax River IWW ' (1) ·
'L-6 Canal ' (1) ·
'Middle Haw Creek ' (1) ·
'Misner Branch ' (1) ·
'Misner Creek ' (1) ·
'Sebastian Canal ' (1) ·
'SR-40 ' (1) ·
'SR-514 ' (1) ·
'Tillman Canal ' (1) ·
'Tomoka River ' (1) ·
'Trib to Groover Creek ' (1) ·
'Turkey Creek ' (1) ·
'WB SR 80 ' (1)
'Babcock Street ' (1) ·
'Briar Creek Blvd. ' (1) ·
'EBSR80 to SBSR807 ' (1) ·
'Hurley Blvd ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Main Trail ' (1) ·
'Malabar Rd ' (1) ·
'NB SR 807 ' (1) ·
'NBSR807 to EBSR80 ' (1) ·
'SB SR 807 ' (1) ·
'SBSR807 to EBSR80 ' (1) ·
'SR-40 ' (1) ·
'SR-40 EB ' (1) ·
'SR-40 WB ' (1) ·
'SR-807 Congress Av' (1) ·
'Tymber Creek Road ' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1)
700034 (1) ·
700119 (1) ·
700162 (1) ·
700202 (1) ·
700204 (1) ·
700205 (1) ·
704004 (1) ·
704042 (1) ·
705500 (1) ·
705919 (1) ·
790027 (1) ·
790077 (1) ·
790078 (1) ·
790118 (1) ·
790119 (1) ·
790132 (1) ·
790163 (1) ·
790182 (1) ·
790185 (1) ·
790186 (1) ·
790193 (1) ·
790920 (1) ·
794072 (1) ·
794082 (1) ·
796000 (1) ·
930466 (1) ·
930472 (1) ·
930473 (1) ·
930474 (1) ·
930475 (1) ·
930476 (1) ·
930532 (1) ·
930533 (1)
'0.6 mi S of Pt Malabar Bl' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.0 Mi N of SR-40 ' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1.4 Mi N of SR-40 ' (1) ·
'1.5 Mi. S of SR-514 ' (1) ·
'1.6 miles North of SR-40 ' (1) ·
'2.5 Miles West of CR-509 ' (1) ·
'3.0 miles North of SR-40 ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'I-95 - SR-514 ' (1) ·
'I-95 NB - Tillman Canal ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'I-95 SB- Tillman Canal ' (1) ·
'SE quadrant PB Int Airprt' (1) ·
'SE quadrant PB Int Airpt ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-40 west of SR-5A ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 NB over Goat Creek ' (1) ·
'US-1 SB - Tomoka River ' (1) ·
'US-1 SB over Goat Creek ' (1)
26394300 (1) ·
26403435 (1) ·
26403445 (1) ·
26403485 (1) ·
26403501 (1) ·
26403530 (1) ·
26403721 (1) ·
26403812 (1) ·
27531888 (1) ·
27580607 (1) ·
27580636 (1) ·
27584460 (1) ·
27591529 (1) ·
27595475 (1) ·
27595640 (1) ·
28003795 (1) ·
28004733 (1) ·
28004737 (1) ·
29143956 (1) ·
29151698 (1) ·
29151780 (1) ·
29152514 (1) ·
29154558 (1) ·
29154580 (1) ·
29163799 (1) ·
29164002 (1) ·
29165358 (1) ·
29171420 (1) ·
29173342 (1) ·
29174390 (1) ·
29174587 (1) ·
29181820 (1) ·
29181868 (1)
80045427 (1) ·
80045433 (1) ·
80045890 (1) ·
80045945 (1) ·
80045990 (1) ·
80051470 (1) ·
80051800 (1) ·
8005960 (1) ·
80323926 (1) ·
80324008 (1) ·
80355219 (1) ·
80370039 (1) ·
80372083 (1) ·
80374985 (1) ·
80382659 (1) ·
80382780 (1) ·
80424614 (1) ·
80424640 (1) ·
81030614 (1) ·
81042417 (1) ·
81044651 (1) ·
81051670 (1) ·
81053827 (1) ·
81053911 (1) ·
81054109 (1) ·
81065740 (1) ·
81070414 (1) ·
81070520 (1) ·
81072482 (1) ·
81072493 (1) ·
81074630 (1) ·
81074819 (1) ·
81133337 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 33 results in range #1 to #33.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)