Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12171 (1) ·
12232 (1) ·
12271 (1) ·
12275 (1) ·
12277 (1) ·
12281 (1) ·
12282 (1) ·
12285 (1) ·
12287 (1) ·
16008 (1) ·
16011 (1) ·
16019 (1) ·
16031 (1) ·
16032 (1) ·
16033 (1) ·
16036 (1) ·
16037 (1) ·
16044 (1) ·
16045 (1) ·
16051 (1) ·
16056 (1) ·
16067 (1) ·
16082 (1) ·
16083 (1) ·
16090 (1) ·
16091 (1) ·
16092 (1) ·
16093 (1)
'ANGLE RD & BELCHER CANAL' (1) ·
'Belcher Canal (C-25) ' (1) ·
'BIG MUD CREEK ' (1) ·
'C-37 Canal ' (1) ·
'CANAL ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'DRAINAGE DITCH ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'Grant Canal ' (1) ·
'ICWW ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'SR 70 ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'TAYLOR CREEK ' (1) ·
'Taylor Creek(C-25 Canal)' (1) ·
'TEN MILE CREEK ' (1) ·
'Tillman Canal ' (1)
'Americana Blvd. ' (1) ·
'Aviation Ave. ' (1) ·
'Brittan Avenue ' (1) ·
'CR605 OLD DIXIE HW' (1) ·
'Eldron Blvd ' (1) ·
'Emerson Drive ' (1) ·
'I-95 ' (1) ·
'Malabar Rd ' (1) ·
'NB SR-615 ' (1) ·
'Palm Bay Library ' (1) ·
'PICOS RD 154.90 ' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-615 ' (1) ·
'SR 614 (INDRIO-RD)' (1) ·
'SR A1A ' (1) ·
'SR AIA ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-507 NB ' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 N/S TPK 153.7' (1) ·
'SR91 N/S TPK 154.3' (1) ·
'SR91 N/S TPK 156.6' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'SR91 SB TPK 157.9 ' (1)
700101 (1) ·
700185 (1) ·
704256 (1) ·
705906 (1) ·
705908 (1) ·
705914 (1) ·
705915 (1) ·
705918 (1) ·
705953 (1) ·
940003 (1) ·
940009 (1) ·
940029 (1) ·
940053 (1) ·
940055 (1) ·
940057 (1) ·
940064 (1) ·
940065 (1) ·
940072 (1) ·
940073 (1) ·
940085 (1) ·
940094 (1) ·
940110 (1) ·
940135 (1) ·
940137 (1) ·
940146 (1) ·
940147 (1) ·
940148 (1) ·
940149 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.2 mi S of Cocoa Street ' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.3 MILES NORTH OF US-1 ' (1) ·
'0.4 Mi N of Grant Rd. ' (1) ·
'0.42 MI NORTH OF SR-68 ' (1) ·
'0.5 mi N of Malabar Rd. ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.51 MI NORTH OF SR-70 ' (1) ·
'0.6 MI E OF I-95 ON SR614' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.16 MI S OF SR-68 ' (1) ·
'1.2 MI NORTH OF SR-70 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'10ft. E of Minton Road ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'South Causeway over ICWW ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1) ·
'SR-507 NB - Tillman Canal' (1)
27205945 (1) ·
27211650 (1) ·
27240944 (1) ·
27243006 (1) ·
27244459 (1) ·
27250685 (1) ·
27253205 (1) ·
27255887 (1) ·
27271813 (1) ·
27272767 (1) ·
27275800 (1) ·
27275808 (1) ·
27280680 (1) ·
27280700 (1) ·
27281279 (1) ·
27281300 (1) ·
27283525 (1) ·
27283630 (1) ·
27311800 (1) ·
27555130 (1) ·
27583761 (1) ·
27590343 (1) ·
27594683 (1) ·
27595668 (1) ·
28002288 (1) ·
28003971 (1) ·
28004740 (1) ·
28004758 (1)
80143606 (1) ·
80144500 (1) ·
80190872 (1) ·
80194850 (1) ·
80195440 (1) ·
80205810 (1) ·
80205848 (1) ·
80205900 (1) ·
80205926 (1) ·
80235220 (1) ·
80240119 (1) ·
80240662 (1) ·
80242270 (1) ·
80244387 (1) ·
80250650 (1) ·
80254672 (1) ·
80262200 (1) ·
80263496 (1) ·
80263571 (1) ·
80361398 (1) ·
80371970 (1) ·
80384417 (1) ·
80394165 (1) ·
80400209 (1) ·
80401484 (1) ·
80401747 (1) ·
80401795 (1) ·
80401800 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
Moderate to major deterioration or disintegration, extensive cracking and leaching or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 28 results in range #1 to #28.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)