Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BLIND CREEK ' (1) ·
'FEC Railroad ' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'Hypoluxo Rd. ' (1) ·
'Hypoluxo Road ' (1) ·
'Intracoastal Waterway ' (1) ·
'LAKE OSBOURNE ' (1) ·
'Lantana Road ' (1) ·
'LWDD LAT 17 CANAL ' (1) ·
'LWDD LAT CANAL 17 ' (1) ·
'Moore's Creek ' (1) ·
'MOORES CREEK ' (1) ·
'Relief E.of North Bridge' (1) ·
'SR 70 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1)
'CONGRESS AVE NB ' (1) ·
'CONGRESS AVE SB ' (1) ·
'CR-707(Citrus Ave)' (1) ·
'Hypoluxo to SB I95' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'LANTANA ROAD WB ' (1) ·
'Lantana to I 95 SB' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NORTH 2ND STREET ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR A1A ' (1) ·
'SR-A1A ' (1) ·
'US-1 (SR-5) ' (1)
930274 (1) ·
930275 (1) ·
930298 (1) ·
930299 (1) ·
934331 (1) ·
934332 (1) ·
934341 (1) ·
940004 (1) ·
940020 (1) ·
940045 (1) ·
940046 (1) ·
940047 (1) ·
940084 (1) ·
940101 (1) ·
940102 (1) ·
940134 (1) ·
940151 (1) ·
945000 (1)
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.6 MI WEST OF I-95 ' (1) ·
'0.6Mi S OF CR-812 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1 mile North of SR-70 ' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'Hypoluxo Rd I 95 Interch ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'Lantana I 95 Interchange ' (1) ·
'SR A1A FPL Nuc P Intake ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)