Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'Intracoastal Waterway ' (1) ·
'LATERAL U CANAL ' (1) ·
'Little Lake Worth ' (1) ·
'Loxahatchee Slough ' (1) ·
'Military Trail ' (1) ·
'Northlake Blvd. ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (PGA BV INT) ' (1) ·
'SR786 I95 I95 Ramps ' (1)
884067 (1) ·
930349 (1) ·
930378 (1) ·
930379 (1) ·
930388 (1) ·
930441 (1) ·
930492 (1) ·
930516 (1) ·
930546 (1) ·
930557 (1) ·
931013 (1) ·
934148 (1) ·
934149 (1)
'0.25 mile North of SR 786' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'1 mile North of SR 786 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1st overpass east of I-95' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'Between SR 710 and 786 ' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'Palm Beach Garden Interch' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)