Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th Street Canal ' (1) ·
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'Daytona Canal ' (1) ·
'Halifax Canal ' (1) ·
'Halifax River ' (1) ·
'Halifax River IWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'Intracoastal Waterway ' (1) ·
'Kellers Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'Murray Creek ' (1) ·
'Navy Canal ' (1) ·
'Nova Canal ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'W.P.B. Canal (C-51) ' (1)
'Ballough Street ' (1) ·
'Bellevue Ave ' (1) ·
'Driveway Ent. Exit' (1) ·
'EB SR 802 Lake Ave' (1) ·
'KELLER ROAD ' (1) ·
'Main Street ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PIPER'S GLEN ROAD ' (1) ·
'Riverside Dr ' (1) ·
'SB I 95 SR 9 ' (1) ·
'Shop Ctr Entrance ' (1) ·
'SR-400 ' (1) ·
'SR-5A ' (1) ·
'SR-805 (Dixie Hwy)' (1) ·
'SR802 (Lake Worth)' (1) ·
'US-1 ' (1) ·
'US-92 ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1) ·
'WB SR 802 Lake Ave' (1) ·
'Williamson Blvd ' (1) ·
'Woodcliff Drive ' (1)
790008 (1) ·
790021 (1) ·
790097 (1) ·
790114 (1) ·
790135 (1) ·
790164 (1) ·
790165 (1) ·
790181 (1) ·
790187 (1) ·
790188 (1) ·
790199 (1) ·
790249 (1) ·
794004 (1) ·
794042 (1) ·
794096 (1) ·
795000 (1) ·
795001 (1) ·
930073 (1) ·
930104 (1) ·
930318 (1) ·
930373 (1) ·
930508 (1) ·
930509 (1) ·
934940 (1) ·
936350 (1)
'.3 mi South of Mason Ave ' (1) ·
'.4mi. East of Congress ' (1) ·
'.75 MI. S. of US-92 ' (1) ·
'.75 miles South of SR-882' (1) ·
'0.1Mi S of LPGA Blvd ' (1) ·
'0.2 MI W of I-95 ' (1) ·
'0.4 Mi W of I-95 ' (1) ·
'0.5 MI WEST OF SR-809 ' (1) ·
'0.5 Mi W of SR-A1A ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1.4 miles North of US-92 ' (1) ·
'10ft. East of Nova Road ' (1) ·
'1200ft. N. of SR-400 ' (1) ·
'1400ft. N. of SR-400 ' (1) ·
'4.3 Mi North of SR-44 ' (1) ·
'40ft. E. of SR-5A ' (1) ·
'800ft. N. of SR-400 ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'SR-400 and Nova Rd. ' (1) ·
'US-92 EB - Halifax River ' (1) ·
'US-92 EB -Tomoka River ' (1) ·
'US-92 WB - Halifax Ri IWW' (1) ·
'US-92 WB-Tomoka River ' (1)
26295449 (1) ·
26365544 (1) ·
26365576 (1) ·
26370205 (1) ·
26381073 (1) ·
26383999 (1) ·
26384400 (1) ·
26384575 (1) ·
29044616 (1) ·
29095064 (1) ·
29095111 (1) ·
29095910 (1) ·
29103167 (1) ·
29103958 (1) ·
29104333 (1) ·
29104539 (1) ·
29110190 (1) ·
29112242 (1) ·
29113367 (1) ·
29125374 (1) ·
29125666 (1) ·
29125688 (1) ·
29132317 (1) ·
29133119 (1) ·
29144556 (1)
80022882 (1) ·
80024618 (1) ·
80032221 (1) ·
80040600 (1) ·
80040715 (1) ·
80041919 (1) ·
80050085 (1) ·
80075212 (1) ·
80572087 (1) ·
81005684 (1) ·
81005748 (1) ·
81010394 (1) ·
81012374 (1) ·
81014150 (1) ·
81014276 (1) ·
81014315 (1) ·
81014361 (1) ·
81014689 (1) ·
81015422 (1) ·
81020145 (1) ·
81021145 (1) ·
81051588 (1) ·
81052615 (1) ·
81052672 (1) ·
81052755 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 25 results in range #1 to #25.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)