Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Babcock St(CR-507)' (1) ·
'Caballero Ave ' (1) ·
'CR-516 ' (1) ·
'DUDA ROAD ' (1) ·
'Eldron Blvd ' (1) ·
'Eldron Blvd. ' (1) ·
'Jupiter Blvd. ' (1) ·
'Minton Rd. ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'Port Malabar Bl EB' (1) ·
'Robt J Conla Bl EB' (1) ·
'Robt J Conla Bl WB' (1) ·
'SAM SENTER RD ' (1) ·
'SR-15 Main St. ' (1)
700160 (1) ·
700188 (1) ·
704143 (1) ·
704150 (1) ·
704151 (1) ·
705907 (1) ·
705909 (1) ·
705910 (1) ·
705913 (1) ·
705916 (1) ·
705917 (1) ·
930030 (1) ·
930338 (1) ·
930360 (1) ·
934513 (1) ·
934519 (1)
'0.2 mi S of Jupiter Blvd ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 mi N of Malabar Road ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1.35 mi North of SR-516 ' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At East Canal St. ' (1) ·
'Babcock Street over I-95 ' (1) ·
'CR-516 over I-95 ' (1) ·
'Minton Road-I-95 ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.