Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Canal No. 1 (Rim Canal) ' (1) ·
'E-2 Canal ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'OCEAN CANAL L-13 ' (1) ·
'PAHOKEE DRAIN CANAL M-2 ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'SFC DIST CANAL NO 1 ' (1)
930030 (1) ·
930338 (1) ·
930360 (1) ·
930471 (1) ·
930805 (1) ·
930806 (1) ·
934505 (1) ·
934513 (1) ·
934515 (1) ·
934519 (1) ·
934552 (1) ·
934553 (1) ·
935100 (1) ·
936701 (1)
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'1 Mi. S of US-441 ' (1) ·
'1.2MI S OF US-98 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1MI SW OF US-441 ' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'6MI E OF BELLE GLADE ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'At East Canal St. ' (1) ·
'AT TEDDAR ROAD ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)