Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'10th Ave. North ' (1) ·
'10th Ave North ' (1) ·
'6 Ave S to NB I-95' (1) ·
'EB SR 802 Lake Ave' (1) ·
'I 95 SR 9 ' (1) ·
'Levee Road ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NW 2ND ST ' (1) ·
'NW 5TH STREET ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 to 6 Ave S' (1) ·
'SE 7TH STREET ' (1) ·
'SR802 (Lake Worth)' (1) ·
'WB SR 802 Lake Ave' (1)
930030 (1) ·
930073 (1) ·
930104 (1) ·
930260 (1) ·
930263 (1) ·
930273 (1) ·
930318 (1) ·
930360 (1) ·
930508 (1) ·
930509 (1) ·
930510 (1) ·
930511 (1) ·
930805 (1) ·
935100 (1)
'.4mi. East of Congress ' (1) ·
'0.4 MI W of SR-7 (US-441)' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'1 mile North of SR 812 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'10th Ave over I 95 ' (1) ·
'300FT East of CR-717 ' (1) ·
'750FT W OF SR-7 (US-441) ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'NE Quad I 95 6th Ave S ' (1) ·
'NW Quad I-95/6th Ave S ' (1)
100 (1) ·
10500 (1) ·
113000 (1) ·
190500 (1) ·
21000 (1) ·
2150 (1) ·
2302 (1) ·
28500 (1) ·
3825 (1) ·
7350 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12752 (1) ·
150 (1) ·
18218 (1) ·
196055 (1) ·
2603 (1) ·
330518 (1) ·
36435 (1) ·
3994 (1) ·
49448 (1) ·
7980 (1)
Showing below up to 14 results in range #1 to #14.