Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
12150 (1) ·
13670 (1) ·
13695 (1) ·
13696 (1) ·
13717 (1) ·
13718 (1) ·
13719 (1) ·
13722 (1) ·
13723 (1) ·
13728 (1) ·
13729 (1) ·
13730 (1) ·
13731 (1) ·
13736 (1) ·
13741 (1) ·
13748 (1) ·
13749 (1) ·
13752 (1) ·
13765 (1) ·
13776 (1) ·
13784 (1) ·
13809 (1) ·
13810 (1) ·
13811 (1) ·
13812 (1) ·
13813 (1) ·
18729 (1) ·
18734 (1)
'Berrys Canal ' (1) ·
'Brando Canal ' (1) ·
'Callalisa Creek ' (1) ·
'Canal ' (1) ·
'Conners Canal ' (1) ·
'Creek ' (1) ·
'Gabordy's Canal ' (1) ·
'Groover Creek ' (1) ·
'Halifax River IWW ' (1) ·
'Indian River Relief East' (1) ·
'IWW Indian River ' (1) ·
'Middle Haw Creek ' (1) ·
'Misner Branch ' (1) ·
'Misner Creek ' (1) ·
'SR-40 ' (1) ·
'Tomoka River ' (1) ·
'Trib to Groover Creek ' (1) ·
'Turnbull Creek ' (1) ·
'US-1 & FECRR ' (1) ·
'Yacht Club Cut ' (1)
'Barracuda Blvd. ' (1) ·
'Fifth Street ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Magnolia St. ' (1) ·
'Main Trail ' (1) ·
'Riverside Drive ' (1) ·
'SR-40 ' (1) ·
'SR-40 EB ' (1) ·
'SR-40 WB ' (1) ·
'SR-404 WB ' (1) ·
'SR-44 ' (1) ·
'Turnbull Bay Road ' (1) ·
'Tymber Creek Road ' (1) ·
'US-1 ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1)
700078 (1) ·
790027 (1) ·
790077 (1) ·
790078 (1) ·
790117 (1) ·
790118 (1) ·
790119 (1) ·
790128 (1) ·
790132 (1) ·
790149 (1) ·
790150 (1) ·
790151 (1) ·
790152 (1) ·
790163 (1) ·
790172 (1) ·
790182 (1) ·
790185 (1) ·
790186 (1) ·
790193 (1) ·
790920 (1) ·
794022 (1) ·
794072 (1) ·
794082 (1) ·
795700 (1) ·
795701 (1) ·
795713 (1) ·
795729 (1) ·
796000 (1)
'0.13mi NW from N Causeway' (1) ·
'0.1mi E of Riverside Dr ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1.0 Mi N of SR-40 ' (1) ·
'1.4 Mi N of SR-40 ' (1) ·
'1.6 miles North of SR-40 ' (1) ·
'1.9 Miles West of US-1 ' (1) ·
'200ft. S of 10th Street ' (1) ·
'3.0 miles North of SR-40 ' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 over SR-40 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'New Smyrna Bch C.L. ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-40 over IWW ' (1) ·
'SR-40 over Middle Haw Cr.' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-40 west of SR-5A ' (1) ·
'SR-404 WB-Indian River ' (1) ·
'SR-44 - Berrys Canal ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-44 - Conners Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'SR-44 over US-1 ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 SB - Tomoka River ' (1)
28122646 (1) ·
29001688 (1) ·
29001730 (1) ·
29001931 (1) ·
29004760 (1) ·
29011550 (1) ·
29012564 (1) ·
29014148 (1) ·
29014444 (1) ·
29015737 (1) ·
29020655 (1) ·
29021928 (1) ·
29030413 (1) ·
29143956 (1) ·
29151698 (1) ·
29151780 (1) ·
29152514 (1) ·
29154558 (1) ·
29154580 (1) ·
29163799 (1) ·
29164002 (1) ·
29165358 (1) ·
29171420 (1) ·
29173342 (1) ·
29174390 (1) ·
29174587 (1) ·
29181820 (1) ·
29181868 (1)
80383781 (1) ·
80541414 (1) ·
80542264 (1) ·
80544173 (1) ·
80545000 (1) ·
80545204 (1) ·
80545465 (1) ·
80545924 (1) ·
80545970 (1) ·
80550332 (1) ·
80551845 (1) ·
80553031 (1) ·
80573537 (1) ·
81030614 (1) ·
81042417 (1) ·
81044651 (1) ·
81051670 (1) ·
81053827 (1) ·
81053911 (1) ·
81054109 (1) ·
81065740 (1) ·
81070414 (1) ·
81070520 (1) ·
81072482 (1) ·
81072493 (1) ·
81074630 (1) ·
81074819 (1) ·
81133337 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 28 results in range #1 to #28.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)