Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'14TH STREET CANAL ' (1) ·
'ICWW ' (1) ·
'Indian River East Relief' (1) ·
'Lateral "B" Canal ' (1) ·
'LATERAL B CANAL ' (1) ·
'LATERAL E DRAIN CANAL ' (1) ·
'MAIN CANAL ' (1) ·
'MAIN CANAL VERO BEACH ' (1) ·
'Main Relief Canal ' (1) ·
'RIO MAR BAY ' (1) ·
'ROEBUCK CREEK ' (1) ·
'South Relief Canal ' (1) ·
'W. Relief Indian River ' (1)
'12th Street ' (1) ·
'16TH ST ' (1) ·
'1st St SW ' (1) ·
'20TH AVENUE ' (1) ·
'27TH STREET ' (1) ·
'5th Street ' (1) ·
'BUCKSKIN TRAIL ' (1) ·
'CR-603-IND RIV BLV' (1) ·
'CR-612 8th Street ' (1) ·
'EB SR60 ' (1) ·
'Emerson Ave 27th A' (1) ·
'Jensen Bch. Cswy. ' (1) ·
'NW 27TH AVE. ' (1) ·
'SR-60 ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'SR-60 WB ' (1) ·
'SR-732 Jensen Bch.' (1) ·
'US-1 (SR-5) ' (1) ·
'VETERANS WALK ' (1)
880030 (1) ·
880085 (1) ·
880087 (1) ·
880088 (1) ·
884054 (1) ·
884057 (1) ·
884059 (1) ·
884062 (1) ·
884066 (1) ·
884069 (1) ·
884072 (1) ·
884073 (1) ·
884075 (1) ·
884077 (1) ·
885808 (1) ·
885809 (1) ·
885810 (1) ·
890138 (1) ·
890146 (1) ·
894051 (1)
'.75mi E. of Indian R Dr. ' (1) ·
'0.2 MILE WEST OF US-1 ' (1) ·
'0.4Mi. North of SR-60 ' (1) ·
'0.6Mi. W of SR-A1A ' (1) ·
'0.75 Mile North of SR-60 ' (1) ·
'1.4MI NORTH OF US-1 ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'150ft. W of WILDWOOD DR ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2.6 MILES S OF SR-60 ' (1) ·
'2.8MI S OF SR-60 ' (1) ·
'20ft. E of 58th Ave/CR613' (1) ·
'30ft. E of 58th Ave/CR613' (1) ·
'At 58th Ave ' (1) ·
'At CR-613 - 58th Ave ' (1) ·
'INSIDE RIVERSIDE PARK ' (1) ·
'SR-60 1.6MILES W. OF A1A ' (1) ·
'SR60 1.6Miles W. of A1A ' (1) ·
'W. of Jensen Bch. Cswy. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 20 results in range #1 to #20.