Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Belcher Canal (C-25) ' (1) ·
'BELCHER CANAL C-25 ' (1) ·
'CANAL ' (1) ·
'Canal - D ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CANAL L-20 ' (1) ·
'CPB20 CANAL ' (1) ·
'DRAINAGE CANAL ' (1) ·
'ITCWD CANAL #1 ' (1) ·
'ITCWD CANAL #2 ' (1) ·
'ITCWD CANAL 3 ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'M-1 CANAL ' (1) ·
'M-2 CANAL ' (1) ·
'RELIEF CANAL ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SR-68 ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-9 (I-95) ' (1) ·
'West Palm Beach Canal ' (1)
'53RD STREET ' (1) ·
'BOBWHITE ROAD ' (1) ·
'CRESTWOOD BLVD ' (1) ·
'CRESTWOOD BLVD. ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'GOLDFINCH LANE ' (1) ·
'Graham Road ' (1) ·
'GRANDVIEW WAY ' (1) ·
'Kings Highway ' (1) ·
'LA MANCHA AVE. ' (1) ·
'MADRID STREET ' (1) ·
'MINUTE MAID RD 165' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'NB US-441 (SR-7) ' (1) ·
'OKEECHOBEE BLVD. ' (1) ·
'OKEECHOBEE RD WB ' (1) ·
'OKEECHOBEE RD. EB ' (1) ·
'PIONEER ROAD ' (1) ·
'PONCE DE LEON ST ' (1) ·
'RAVEN COURT ' (1) ·
'RDBGH RD 170.14 ' (1) ·
'ROYAL PALM BCH BLV' (1) ·
'ROYAL PLM BH BL NB' (1) ·
'ROYAL PLM BH BL SB' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SB US-441 (SR-7) ' (1) ·
'SPARROW DRIVE ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 80/Southern Bld' (1) ·
'SR91 N/S TPK 167.2' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'US-98 (SR-80) ' (1)
Number 008:
'0.03MI W OF DOVE CIRCLE ' (1) ·
'0.1MI N OF BELVEDERE ROAD' (1) ·
'0.1MI N of BILBAO ST. ' (1) ·
'0.1MI N OF OKEECHOBEE BLV' (1) ·
'0.1MI N OF SANDPIPER AVE.' (1) ·
'0.1MI S OF OKEECHOBEE BL ' (1) ·
'0.1MI W OF SEM PRATT WHIT' (1) ·
'0.2Mi W OF ROYAL P.B. BLV' (1) ·
'0.3M N OF OKEECHOBEE BLV ' (1) ·
'0.3MI N OF OKEECHOBEE BLV' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.3MI W OF RYL PALM BH BL' (1) ·
'0.6MI S OF OKEECHOBEE BLV' (1) ·
'0.8MI N OF SR 80 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.2MI S OF OKEECHOBEE BL ' (1) ·
'1.3MI N OF SR-80 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'100FT N ANGLE RD CR-607A ' (1) ·
'175FT S of LAS PALMAS ST ' (1) ·
'180FT E OF SANDPIPER AVE ' (1) ·
'180ft W of LAS PALMAS ST.' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2MI N OF OKEECHOBEE BLV ' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'4 miles west of SR 7 ' (1) ·
'6.4 MI S OF INDIAN RVR CO' (1) ·
'82FT EAST OF SR-7 ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1) ·
'Just North of SR70 on I95' (1) ·
'SR-7 & SR-80 intersection' (1)
Latitude 016:
Longitude 017:
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 42 results in range #1 to #42.
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch