Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-17 Canal ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'I-95 (S.R. 9) ' (1) ·
'I-95 (SR-9) ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'Lateral B Canal ' (1) ·
'Okeechobee Waterway ' (1) ·
'SR 802 LAKE WORTH RD ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'Thompson River ' (1) ·
Sebastian River (1)
'10th Ave North ' (1) ·
'Becker Road ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Central Blvd ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-714 Indian St. ' (1) ·
'Crosstown Parkway ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'LPGA Blvd ' (1) ·
'Military Trail ' (1) ·
'SR 710 ' (1) ·
'SR 804 ' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 N/S TPK 93.3 ' (1) ·
US-1 (1)
700224 (1) ·
790171 (1) ·
884071 (1) ·
894062 (1) ·
930069 (1) ·
930237 (1) ·
930263 (1) ·
930289 (1) ·
930379 (1) ·
930534 (1) ·
931001 (1) ·
931006 (1) ·
934138 (1) ·
934360 (1) ·
940160 (1) ·
940161 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'1 mile North of SR 786 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'2.0 MILES N OF SR 812 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'ADJACENT TO US-441 ' (1) ·
'At CR-613 ' (1) ·
'Becker Rd/I-95 interchge ' (1) ·
'Crosstown Pkwy/I-95 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Just West of I 95 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)