Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-17 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'Clint Moore Road ' (1) ·
'CSX RR ' (1) ·
'E-1 CANAL ' (1) ·
'El Rio Canal E-4 ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 ' (1) ·
'Lake Ida / Canal E-4 ' (1) ·
'Lateral B Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Okeechobee Waterway ' (1) ·
'SR 808 GLADES RD ' (1) ·
'Thompson River ' (1) ·
Indian River Relief East (1) ·
Sebastian River (1)
'10th Ave North ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'Central Blvd ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-714 Indian St. ' (1) ·
'LANTANA RD.CR-812 ' (1) ·
'LPGA Blvd ' (1) ·
'Military Trail ' (1) ·
'SR 710 ' (1) ·
'SR 804 ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SR91 N/S TPK 75.92' (1) ·
SR-520 (1) ·
US-1 (1)
700196 (1) ·
700224 (1) ·
790171 (1) ·
884071 (1) ·
894062 (1) ·
930069 (1) ·
930237 (1) ·
930263 (1) ·
930289 (1) ·
930379 (1) ·
930416 (1) ·
930438 (1) ·
930534 (1) ·
931000 (1) ·
934138 (1) ·
934212 (1) ·
934282 (1) ·
934360 (1) ·
934470 (1) ·
934491 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.25mi. east of I-95 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.7 mi south of PGA Blvd.' (1) ·
'0.7 mi. W of I-95 ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1 mile North of SR 786 ' (1) ·
'10th Ave North over I 95 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'ADJACENT TO US-441 ' (1) ·
'At CR-613 ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'Just W. of Congress Ave.' (1) ·
'Just West of I 95 ' (1) ·
'LPGA Blvd. at I-95 ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
SR-520 - Indian River Relief (1) ·
US-1 over Sebastian River (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)