Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'Boynton Canal C16 ' (1) ·
'Burns Road ' (1) ·
'C-51 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CSX Railroad ' (1) ·
'Depot Ave & El Rio Canal' (1) ·
'Earman River (C-17) ' (1) ·
'Lake Ida Road ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Main Canal ' (1) ·
'Palmetto Park Road ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR 806 W Atlantic Avenue' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-710 ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'SW 10th St. Lowson Blvd ' (1)
'EB US 98 SR 80 ' (1) ·
'I 95 NB ' (1) ·
'I 95 SB ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Peninsula Corp Dr ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR A1A ' (1) ·
'SR-60 Osceola Blvd' (1) ·
'U.S.-1 (SR-5) ' (1) ·
'US-1 ' (1) ·
'US-1 (SR-5) ' (1) ·
'US1(SR5) ' (1) ·
'WB US 98 SR 80 ' (1)
790013 (1) ·
880030 (1) ·
930001 (1) ·
930003 (1) ·
930173 (1) ·
930188 (1) ·
930189 (1) ·
930201 (1) ·
930443 (1) ·
930461 (1) ·
930470 (1) ·
930496 (1) ·
930497 (1) ·
930498 (1) ·
930501 (1) ·
930502 (1) ·
930503 (1) ·
930508 (1) ·
930509 (1) ·
930518 (1) ·
930524 (1) ·
930547 (1) ·
940101 (1) ·
940152 (1)
'0.2 mi E of SR5 on SRA1A ' (1) ·
'0.5 mi N of Atlantic Ave ' (1) ·
'0.6 mile South of SR 882 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'0.75 mile South of SR 708' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.3 mile S of Linton Rd. ' (1) ·
'2.25Mi. W of US-1 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'Between N Lake/PGA Blvds ' (1) ·
'Boca Raton ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'E Congress Ave & S SR 806' (1) ·
'I 95 Over Lowson Blvd ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just North of SR-850 ' (1) ·
'Just South of Exit 48 ' (1) ·
'Port of Palm Beach ' (1) ·
'SR 80/ I-95 interchange ' (1) ·
'US-1 over 11th Canal ' (1)
26210275 (1) ·
26234000 (1) ·
26234020 (1) ·
26251431 (1) ·
26264870 (1) ·
26274200 (1) ·
26280900 (1) ·
26281730 (1) ·
26322094 (1) ·
26384400 (1) ·
26384575 (1) ·
26403390 (1) ·
26403485 (1) ·
26430558 (1) ·
26460153 (1) ·
26461850 (1) ·
26483005 (1) ·
26495114 (1) ·
27245841 (1) ·
27265100 (1) ·
27381900 (1) ·
29144436 (1)
80023637 (1) ·
80031952 (1) ·
80032135 (1) ·
80032688 (1) ·
80040600 (1) ·
80040715 (1) ·
80041535 (1) ·
80051925 (1) ·
80052100 (1) ·
80052215 (1) ·
80052340 (1) ·
80052450 (1) ·
80052717 (1) ·
80053485 (1) ·
80053615 (1) ·
80054560 (1) ·
80055205 (1) ·
80070500 (1) ·
80222800 (1) ·
80231922 (1) ·
80255800 (1) ·
81022971 (1)
101541 (1) ·
102500 (1) ·
104500 (1) ·
106500 (1) ·
113000 (1) ·
15600 (1) ·
19800 (1) ·
21000 (1) ·
22600 (1) ·
23500 (1) ·
24500 (1) ·
26500 (1) ·
28250 (1) ·
29307 (1) ·
33000 (1) ·
85750 (1) ·
90500 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
148776 (1) ·
157018 (1) ·
176174 (1) ·
177838 (1) ·
181308 (1) ·
184778 (1) ·
196055 (1) ·
27066 (1) ·
33600 (1) ·
34353 (1) ·
36435 (1) ·
40772 (1) ·
42508 (1) ·
45978 (1) ·
49014 (1) ·
50848 (1) ·
57255 (1)
Showing below up to 24 results in range #1 to #24.