Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Callalisa Creek ' (1) ·
'CSX Railroad ' (1) ·
'E-2W Canal ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'ICWW ' (1) ·
'Indian River ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-5 Canal ' (1) ·
'L-6 Canal ' (1) ·
'Lantana Road ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 786 PGA Blvd ' (1) ·
'SR-91 Turnpike ' (1) ·
'Summit Boulevard ' (1)
'Bellevue Avenue ' (1) ·
'E/B Atlantic Ave. ' (1) ·
'EB Okee. Blvd. ' (1) ·
'I 95 NB SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'NB US-27 SR-25 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I 95 to Lantana' (1) ·
'SB US-27 SR-25 ' (1) ·
'SR AIA ' (1) ·
'SR-406 ' (1) ·
'SR-44 ' (1) ·
'SR-472 WB ' (1) ·
'SR-807 Congress Av' (1) ·
'SR804 E Ocean Ave.' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1) ·
'WB Okee. Blvd. ' (1)
700227 (1) ·
790151 (1) ·
790190 (1) ·
790241 (1) ·
930172 (1) ·
930275 (1) ·
930291 (1) ·
930303 (1) ·
930304 (1) ·
930336 (1) ·
930352 (1) ·
930353 (1) ·
930370 (1) ·
930417 (1) ·
930418 (1) ·
930437 (1) ·
930466 (1) ·
930512 (1) ·
930513 (1) ·
940094 (1)
'0.75 mile South of SR 708' (1) ·
'1 Mile S of Boynton Inlet' (1) ·
'1.0mile south of SR-80 ' (1) ·
'1mi. N of Northlake Blvd.' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Atlantic Ave./Fl. Tpk. ' (1) ·
'Bellevue Avenue over I-95' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'Just West of I 95 ' (1) ·
'Lantana I 95 Interchange ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'Palm Beach - Broward Line' (1) ·
'South Causeway over ICWW ' (1) ·
'SR-406 over Indian River ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'SR-704 Over SR-91 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
10584 (1) ·
11104 (1) ·
148776 (1) ·
184778 (1) ·
199525 (1) ·
20820 (1) ·
23770 (1) ·
25158 (1) ·
26199 (1) ·
26459 (1) ·
47712 (1) ·
52050 (1) ·
56821 (1) ·
6159 (1) ·
6940 (1)
Showing below up to 20 results in range #1 to #20.