Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Drainage Canal ' (1) ·
'East Indian River Relief' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'I 95 & CSXRR & Canal ' (1) ·
'Indian River IWW ' (1) ·
'Intracoastal Waterway ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'Long Creek ' (1) ·
'Military Trail & CSX RR ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'None ' (1) ·
'S Fork St. Lucie River ' (1) ·
'SR-404 ' (1) ·
'SR-9 (I-95) ' (1) ·
'Tillman Canal ' (1) ·
'West Indian River Relief' (1)
'Atlantic Avenue ' (1) ·
'East Island Access' (1) ·
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'Military Trail ' (1) ·
'NB I 95 to Gateway' (1) ·
'Spanish River Blvd' (1) ·
'SR A1A ' (1) ·
'SR-507 NB ' (1) ·
'St Lucie West Blvd' (1) ·
'US-1 SB ' (1) ·
'US-192 EB ' (1) ·
'US98/441 SR15/700 ' (1) ·
'WB Forest Hill Bld' (1) ·
'WB Martin Downs Bd' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB SR808 Glades Rd' (1) ·
'WB St. Lucie Blvd.' (1) ·
'West Island Access' (1)
700075 (1) ·
700181 (1) ·
700185 (1) ·
890143 (1) ·
890148 (1) ·
890149 (1) ·
890153 (1) ·
890154 (1) ·
890155 (1) ·
890156 (1) ·
890157 (1) ·
930064 (1) ·
930245 (1) ·
930435 (1) ·
930460 (1) ·
930514 (1) ·
930552 (1) ·
940133 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
940145 (1) ·
940158 (1)
'1.7 miles east of SR 7 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'11.4Mi N of Palm Beach Co' (1) ·
'2mi. East of SR-91 ' (1) ·
'3.9Mi N. of Palm Beach Co' (1) ·
'4.7Mi N. of Palm Beach Co' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'7.4Mi N. of Palm Beach Co' (1) ·
'7.9 Mi N of Palm Beach Co' (1) ·
'700 ft S of Gateway Blvd ' (1) ·
'800 ft West of I 95 ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'East of Ernest Lyons Bri.' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'Spanish R & I95 Csxrr Can' (1) ·
'SR-507 NB - Tillman Canal' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'SR-80 & Military Trail ' (1) ·
'US-1 SB - SR-404 ' (1) ·
'US-192 EB - Indian River ' (1) ·
'West of Ernest Lyons Bri.' (1)
26220610 (1) ·
26230988 (1) ·
26274181 (1) ·
26325800 (1) ·
26390300 (1) ·
26403700 (1) ·
27004265 (1) ·
27012529 (1) ·
27033480 (1) ·
27040084 (1) ·
27063920 (1) ·
27103152 (1) ·
27121600 (1) ·
27123400 (1) ·
27161795 (1) ·
27161803 (1) ·
27161886 (1) ·
27161895 (1) ·
27184103 (1) ·
27224250 (1) ·
28004740 (1) ·
28050237 (1) ·
28121703 (1)
80035127 (1) ·
80041200 (1) ·
80061969 (1) ·
80064300 (1) ·
80071555 (1) ·
80102700 (1) ·
80111100 (1) ·
80115000 (1) ·
80152060 (1) ·
80153061 (1) ·
80191739 (1) ·
80192218 (1) ·
80192691 (1) ·
80193090 (1) ·
80245322 (1) ·
80352939 (1) ·
80371970 (1) ·
80373536 (1) ·
80375331 (1) ·
80385060 (1) ·
80390367 (1) ·
80394266 (1) ·
80395040 (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 23 results in range #1 to #23.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)