Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'C-17 Canal ' (1) ·
'C-51 W.P.B. CANAL ' (1) ·
'E-3 CANAL ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'Halifax River IWW ' (1) ·
'Hillsboro (L-14) Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'IWW Halifax River ' (1) ·
'St. Lucie Canal/SR-76 ' (1) ·
'Tomoka River ' (1) ·
Tillman Canal (1)
'EB Blue Heron Blvd' (1) ·
'EB Forest Hill Bld' (1) ·
'EB Lake Worth Rd. ' (1) ·
'EB PGA Blvd. ' (1) ·
'SR-430 EB ' (1) ·
'SR-430 WB ' (1) ·
'SR-520 WB ' (1) ·
'SR-710 EB ' (1) ·
'SR-710 WB ' (1) ·
'SR-715 ' (1) ·
'SR-A1A ' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US-92 EB ' (1) ·
'US-92 WB ' (1) ·
'US-98 SR700 US441 ' (1) ·
'WB Lake Worth Rd. ' (1) ·
SR-507 SB (1)
700190 (1) ·
700219 (1) ·
790174 (1) ·
790175 (1) ·
790185 (1) ·
790186 (1) ·
790187 (1) ·
790188 (1) ·
890161 (1) ·
890162 (1) ·
930106 (1) ·
930328 (1) ·
930329 (1) ·
930465 (1) ·
930468 (1) ·
930471 (1) ·
934349 (1) ·
940003 (1) ·
940004 (1)
'0.23 MI N FPL POWER PLANT' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1 Mile East of I-95 ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'2.1 Miles E of CR-609 ' (1) ·
'2.1 Miles East of CR-609 ' (1) ·
'Belle Glade 1Mi W SR-80 ' (1) ·
'SR-430 EB - Halifax River' (1) ·
'SR-430 WB - Halifax River' (1) ·
'SR-520 WB - Banana River ' (1) ·
'SR-700 CANAL POINT ' (1) ·
'US-1 NB - Tomoka River ' (1) ·
'US-1 SB - Tomoka River ' (1) ·
'US-92 EB - Halifax River ' (1) ·
'US-92 WB - Halifax Ri IWW' (1) ·
SR-507 SB-Tillman Canal (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)