Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Bear Wildlife Crossing ' (1) ·
'C-54 Canal ' (1) ·
'Cougar Wildlife Crossing' (1) ·
'Deer WIldlife Crossing ' (1) ·
'Fellsmere Canal ' (1) ·
'I-4 ' (1) ·
'I-4 EB ' (1) ·
'I-4 WB ' (1) ·
'Indian River ' (1) ·
'Indian River / ICW ' (1) ·
'Little Lake Worth ' (1) ·
'Spruce Creek ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-421 ' (1) ·
'St. Johns River ' (1) ·
'Tomoka River ' (1) ·
Lake Washington Road (1)
700043 (1) ·
700221 (1) ·
700232 (1) ·
700238 (1) ·
790189 (1) ·
790200 (1) ·
790201 (1) ·
790202 (1) ·
790203 (1) ·
790204 (1) ·
790206 (1) ·
790211 (1) ·
790218 (1) ·
790219 (1) ·
790227 (1) ·
790229 (1) ·
890145 (1) ·
930492 (1) ·
930546 (1)
'.5mi E. of Indian R Dr. ' (1) ·
'0.3 mi east of US 1 & PGA' (1) ·
'1st overpass east of I-95' (1) ·
'Buffer Preserve Drive ' (1) ·
'Graves Ave over I-4 ' (1) ·
'I-4 EB over Tomoka River ' (1) ·
'I-4 WB over Tomoka River ' (1) ·
'I-95 NB over Spruce Creek' (1) ·
'I-95 NB over SR-421 ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'Over Fellsmere Canal ' (1) ·
'SR 400 - Dear Crossing ' (1) ·
'SR 400 EB - Bear Crossing' (1) ·
'SR 400 EB - Cougar Crossi' (1) ·
'SR-415- St.Johns River ' (1) ·
'SR-44 EB - I-4 ' (1) ·
'SR-44 WB over I-4 ' (1) ·
'SR-528 EB - Indian River ' (1) ·
I-95 SB -Lk Washington Rd (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)