Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Owner 022:
FDOT
& Service Under 042b:
Waterway
& Scour 113:
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips.
Use the filters below to narrow your results.
790012 (1) ·
880005 (1) ·
880077 (1) ·
930004 (1) ·
930005 (1) ·
930060 (1) ·
930064 (1) ·
930097 (1) ·
930106 (1) ·
930339 (1) ·
930349 (1) ·
940045 (1) ·
940094 (1)
'.5MI W of A1A & E of SR-5' (1) ·
'0.4 Mi. W of SR-A1A ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.2 mi N Broward Cnty ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'200' East of US-1(SR-5) ' (1) ·
'3/4 MI North of SR-706 ' (1) ·
'6.2 Miles N of SR-510 ' (1) ·
'Between SR-A1A & SR-5 ' (1) ·
'City of Jupiter ' (1) ·
'South Causeway over ICWW ' (1) ·
'US-1 over Reed Canal ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 13 results in range #1 to #13.