Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EB Lake Worth Rd. ' (1) ·
'EB PGA Blvd. ' (1) ·
'EB SR 786 ' (1) ·
'EB SR 802 Lake Ave' (1) ·
'Lake Worth Road ' (1) ·
'PGA Blvd (SR786) ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SR-786(PGA BLVD) ' (1) ·
'SR786 WB to SB I95' (1) ·
'SR802 (Lake Worth)' (1) ·
'WB Lake Worth Rd. ' (1) ·
'WB PGA Blvd. ' (1) ·
'WB SR 786 ' (1) ·
'WB SR 802 Lake Ave' (1)
930073 (1) ·
930104 (1) ·
930106 (1) ·
930265 (1) ·
930318 (1) ·
930328 (1) ·
930329 (1) ·
930349 (1) ·
930356 (1) ·
930388 (1) ·
930413 (1) ·
930456 (1) ·
930491 (1) ·
930492 (1) ·
930557 (1)
'.4mi. East of Congress ' (1) ·
'1 Mile East of Jog Rd. ' (1) ·
'1.61mi east of PGA&SR710 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1mi. east of Jog Rd. ' (1) ·
'1st overpass east of I-95' (1) ·
'I 95 SR 786 Interchange ' (1) ·
'Lake Ave / ICWW ' (1) ·
'Lake Ave. / ICWW ' (1) ·
'Lake Worth Rd at FL Trnpk' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'PGA Blvd 2.3mi. W of TPK.' (1) ·
'Tpk/PGA Blvd interchange ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)