Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'CANAL E-4 ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'E-1 Canal ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'FL TPK SR-91 ' (1) ·
'Lateral A Canal ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'Main Relief Canal ' (1) ·
'RCA CANAL ' (1)
'27th Street ' (1) ·
'57th Street ' (1) ·
'CAMINO REAL ' (1) ·
'CLINT MOORE RD ' (1) ·
'CONGRESS AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'Spanish River Blvd' (1) ·
'SUMMIT BLVD ' (1)
884077 (1) ·
884093 (1) ·
934139 (1) ·
934228 (1) ·
934258 (1) ·
934361 (1) ·
934362 (1) ·
934365 (1) ·
934366 (1) ·
934367 (1) ·
934499 (1) ·
934929 (1) ·
934953 (1) ·
934954 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935223 (1)
'0.3MI E OF CONGRESS ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'100ft E of Fla Turnpike ' (1) ·
'130ft. S of Aviation Blvd' (1) ·
'2.2MI N of Boynton Bch Bl' (1) ·
'50ft W of TPK (SR-91) ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'AT US-441 SR-7 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.