Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-51 Canal ' (1) ·
'DRAINAGE CANAL ' (1) ·
'E-4 Canal ' (1) ·
'L-5 CANAL ' (1) ·
'LATERAL U CANAL ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'PARK LATERAL CANAL ' (1) ·
'SLOUGH ' (1)
884067 (1) ·
884068 (1) ·
930351 (1) ·
934142 (1) ·
934144 (1) ·
934271 (1) ·
934272 (1) ·
934295 (1) ·
934487 (1) ·
934913 (1) ·
934956 (1) ·
934966 (1) ·
934968 (1) ·
934981 (1)
'0.4Mi. East of Congress A' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'0.9 MILES WEST OF TPK ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'7MI NORTH OF SR-60 ' (1) ·
'9.2MI N OF SR-60 ' (1) ·
'S of Southrn/Haverhll Int' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)