Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-23 CANAL ' (1) ·
'C-3 Canal ' (1) ·
'C-51 Canal ' (1) ·
'DANFORTH CREEK ' (1) ·
'E 3.5 AIRPORT CANAL ' (1) ·
'E-1 Canal ' (1) ·
'E-2 Canal ' (1) ·
'E3-canal ' (1) ·
'KELLER CANAL ' (1) ·
'LATERAL A CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'PERENNIAL CANAL ' (1) ·
'Trib to Spruce Creek ' (1) ·
'Turkey Creek ' (1)
'49th St Lindsey Rd' (1) ·
'Benoist Farms Rd ' (1) ·
'CENTER DRIVE ' (1) ·
'CHERRY ROAD ' (1) ·
'CITRUS BLVD. ' (1) ·
'CR-611 (45th ST.) ' (1) ·
'Haverhill Rd ' (1) ·
'Hypoluxo Rd ' (1) ·
'Lake Ida Road ' (1) ·
'MAPP ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'PARK COMMERCE BLVD' (1) ·
'Pioneer Road ' (1) ·
'Port Malabar BL WB' (1) ·
'Tomoka Farms Rd ' (1)
705920 (1) ·
794045 (1) ·
884102 (1) ·
884103 (1) ·
894059 (1) ·
894060 (1) ·
934229 (1) ·
934357 (1) ·
934359 (1) ·
934361 (1) ·
934362 (1) ·
934711 (1) ·
934721 (1) ·
934963 (1) ·
936500 (1)
'0.1 MILE NORTH OF SR-714 ' (1) ·
'0.2MILE S OF SW BECKER RD' (1) ·
'0.4 MILE EAST OF SR-809 ' (1) ·
'0.4 MILE N OF SR-710 ' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'1Mi E of CR809/Military T' (1) ·
'AT CR-615 (66TH AVE.) ' (1) ·
'At CR-615 (66th Ave) ' (1) ·
'AT SR-7 & Hypoluco Rd ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'IN JOHN PRINCE PARK ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.