Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Banana River ' (1) ·
'Canal L-14 ' (1) ·
'E-3 CANAL ' (1) ·
'EL RIO CANAL ' (1) ·
'FIVE MILE CREEK ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'L-14 CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'Lake Ashby Canal ' (1) ·
'MAIN RELIEF CANAL ' (1) ·
'N. NEW RIVER CANAL ' (1) ·
'SFWMD C-51 CANAL ' (1) ·
'SW FORK LOXAHATCHEE RVR ' (1) ·
'Sweetwater Branch ' (1)
'Banana River Drive' (1) ·
'CAMINO REAL ' (1) ·
'CENTRAL BLVD ' (1) ·
'Congress Ave. ' (1) ·
'CR-611 43RD AVE. ' (1) ·
'CR611B(EDWARDS RD)' (1) ·
'JOG ROAD ' (1) ·
'JOG ROAD (NB) ' (1) ·
'Lake Ashby Road ' (1) ·
'LINTON BLVD ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'OKEELANTA RD. ' (1) ·
'Taylor Rd ' (1)
704063 (1) ·
794010 (1) ·
794146 (1) ·
884056 (1) ·
930163 (1) ·
930392 (1) ·
934148 (1) ·
934149 (1) ·
934272 (1) ·
934273 (1) ·
934315 (1) ·
934485 (1) ·
934522 (1) ·
934960 (1) ·
940070 (1)
'0.2 mi East of SR-421 ' (1) ·
'0.3 Mile West of SR-513 ' (1) ·
'0.3MI N of SR-706 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.5Mi W of MILITARY TRAIL' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1MI E of MCNEIL ROAD ' (1) ·
'200ft. East of SR-415 ' (1) ·
'250ft North of SR-60 ' (1) ·
'AT SOUTHERN BLVD. ' (1) ·
'AT US-27 ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.