Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-44 Intake Canal ' (1) ·
'CANAL ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'CYPRESS CREEK ' (1) ·
'E-2 Canal ' (1) ·
'I-95 ' (1) ·
'KELLER CANAL ' (1) ·
'LWDD E-1 CANAL ' (1) ·
'MANATEE POCKET ' (1) ·
'MOORES CREEK ' (1) ·
'NORTH CANAL ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'QUAIL COVEY ROAD ' (1) ·
'Sebastian Canal ' (1) ·
'SFC CANAL NO 1 ' (1) ·
'Spruce Creek ' (1) ·
'ST LUCIE CANAL ' (1)
'Babcock Street ' (1) ·
'CENTER DRIVE ' (1) ·
'CR-510 WABASSO RD ' (1) ·
'CR-712 (MIDWAY RD)' (1) ·
'CR-76A ' (1) ·
'CR726 (Citrus Blv)' (1) ·
'Fay Blvd. ' (1) ·
'HORSESHOE POINT RD' (1) ·
'INDIAN RIV BLVD NB' (1) ·
'INDIAN RIV BLVD SB' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'LAKERIDGE BLVD ' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'PALMWOOD ROAD ' (1) ·
'Pioneer Road ' (1) ·
'RANGE LINERD CR609' (1) ·
'Taylor Road ' (1) ·
'W LAKE RD CR-717 ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
704042 (1) ·
704161 (1) ·
794009 (1) ·
880047 (1) ·
884058 (1) ·
884060 (1) ·
890093 (1) ·
890101 (1) ·
894057 (1) ·
934136 (1) ·
934357 (1) ·
934468 (1) ·
934469 (1) ·
934505 (1) ·
934721 (1) ·
934904 (1) ·
934927 (1) ·
940020 (1) ·
940026 (1) ·
940035 (1)
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.1MI N of DONALD ROSS RD' (1) ·
'0.1MI S of SEAWAY DR A1A ' (1) ·
'0.2 Mi E of ANCHOR AVE. ' (1) ·
'0.2 mi E of CR-415 ' (1) ·
'0.2MI E OF US-441 (SR-7) ' (1) ·
'0.4MI N OF SR-60 ' (1) ·
'0.4MI. N OF SR-60 ' (1) ·
'0.5 Mi. E of Lyons Rd. ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'1.5 Mile West of SR-76 ' (1) ·
'1.74 Miles E of SR-710 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'1MI W of US-1 ' (1) ·
'3MI W OF CR-615 ' (1) ·
'8 mi South of Malabar Rd ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'Fay Blvd. - I-95 ' (1) ·
'IN JOHN PRINCE PARK ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 20 results in range #1 to #20.