Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'BOYNTON CANAL C-16 ' (1) ·
'C. Stanley Weaver Canal ' (1) ·
'E-3 CANAL ' (1) ·
'E-4 Canal ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'LAKEWOOD E4 CANAL ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'QUAIL COVEY ROAD ' (1)
'CONGRESS AVE ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'HYPOLUXO RD. ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LAWRENCE ROAD ' (1) ·
'LE CHALET BLVD ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TR. SB ' (1) ·
'MINER RD. ' (1) ·
'Old Boynton Road ' (1) ·
'SEACREST BLVD. ' (1) ·
'SW 15TH AVE ' (1) ·
'SW 23RD AVE. ' (1) ·
'WOOLBRIGHT ROAD ' (1) ·
'Woolbright Road EB' (1) ·
'Woolbright Road WB' (1)
930214 (1) ·
930302 (1) ·
934344 (1) ·
934461 (1) ·
934468 (1) ·
934469 (1) ·
934487 (1) ·
934491 (1) ·
934499 (1) ·
934913 (1) ·
934914 (1) ·
934934 (1) ·
934935 (1) ·
934942 (1) ·
934948 (1) ·
934951 (1) ·
934981 (1)
'0.25 MI. W OF I-95 ' (1) ·
'0.25MI E OF US 1 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI W OF CONGRESS AVE ' (1) ·
'0.7MI W OF CONGRESS AVE.' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)