Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CAMINO REAL ' (1) ·
'E. CAMINO REAL ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'Minton Rd. ' (1) ·
'Minton Road CR-509' (1) ·
'NEW ENGLAND BLVD ' (1) ·
'Palm Bay Library ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PALMETTO PK RD ' (1) ·
'PALMETTO PK RD EB ' (1) ·
'PALMETTO PK RD WB ' (1) ·
'Port Malabar BL WB' (1) ·
'Spanish River Blvd' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'SW 18th STREET EB ' (1) ·
'SW 18TH STREET WB ' (1) ·
'W. CAMINO REAL ' (1)
704075 (1) ·
704143 (1) ·
704256 (1) ·
705920 (1) ·
934406 (1) ·
934408 (1) ·
934464 (1) ·
934465 (1) ·
934900 (1) ·
934901 (1) ·
934902 (1) ·
934904 (1) ·
934908 (1) ·
934915 (1) ·
934916 (1) ·
934925 (1) ·
934926 (1) ·
934960 (1) ·
935223 (1)
'0.1MI E OF US-441 SR-7 ' (1) ·
'0.3Mi E of Military Trail' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.7MI W OF US-1 ' (1) ·
'0.7MI WEST OF US-1 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'10ft. E of Minton Road ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'2.4 mi S of SR-9 ' (1) ·
'ADJ W SIDE MILITARY TRAIL' (1) ·
'AT SR-809 / WCAMINOREA ' (1) ·
'Minton Road-I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)