Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BULLDOG CANAL ' (1) ·
'BUTTERFLY CANAL ' (1) ·
'CANAL ' (1) ·
'CANAL C-24 ' (1) ·
'CANAL E-4 ' (1) ·
'CANAL N. END LAKE IDA ' (1) ·
'COLLIER CREEK ' (1) ·
'EL RIO CANAL ' (1) ·
'FISHTAIL CANAL ' (1) ·
'Gabordy's Canal ' (1) ·
'L.W.D.D. #10 ' (1) ·
'LAKE IDA CANAL ' (1) ·
'Misner Branch ' (1) ·
'RIO MAR BAY ' (1)
'BEL LIDO DRIVE ' (1) ·
'CAMINO GARDENS EB ' (1) ·
'DATE PALM RD ' (1) ·
'DATE PALM ROAD ' (1) ·
'DAVIS ROAD ' (1) ·
'FLEMING STREET ' (1) ·
'Main Trail ' (1) ·
'MISSION HILL ROAD ' (1) ·
'NORTH SHORE DRIVE ' (1) ·
'Riverside Drive ' (1) ·
'S. LAKE DRIVE ' (1) ·
'SAVONA BLVD. ' (1) ·
'SW 22ND WAY ' (1) ·
'VETERANS WALK ' (1)
795713 (1) ·
796000 (1) ·
885604 (1) ·
885808 (1) ·
935202 (1) ·
935203 (1) ·
935209 (1) ·
935303 (1) ·
935305 (1) ·
935306 (1) ·
935900 (1) ·
937201 (1) ·
937702 (1) ·
945256 (1)
'0.03Mi E of CYPRESS WAY ' (1) ·
'0.2Mi S of 45TH ST(CR702)' (1) ·
'0.3MI N of 10TH AVE N ' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.3MI S of ROYAL PALM WAY' (1) ·
'0.4M S OF ROYAL PALM ' (1) ·
'0.5MI N of GATLIN BLVD. ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'200FT N of NW 22ND STR ' (1) ·
'200ft. S of 10th Street ' (1) ·
'200ft. W of A1A ' (1) ·
'INSIDE RIVERSIDE PARK ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)