Drilldown: bridge data

From Indian River Lagoon Project
bridge data > Owner 022: City & Scour 113: Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures

Use the filters below to narrow your results.

ObjectID:
Status:
Route 005d:
Direction 005e:
Features 006a:
Critical 006b:
Facility 007:
Number 008:
Location 009:
Latitude 016:
Longitude 017:
Owner 022: (Click arrow to add another value)
Built 027:
Lanes 028a:
1 (1) · 2 (1) · 3 (1) · 4 (1) · 6 (1) · 7 (1)
Traffic 029:
Traffic Year 030:
Service Under 042b:
Length 049:
10 (1) · 11 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 16 (1) · 18 (1) · 19 (1) · 198 (1) · 20 (1) · 21 (1) · 22 (1) · 23 (1) · 24 (1) · 27 (1) · 28 (1) · 29 (1) · 30 (1) · 31 (1) · 32 (1) · 33 (1) · 34 (1) · 35 (1) · 38 (1) · 39 (1) · 42 (1) · 44 (1) · 53 (1) · 55 (1) · 6 (1) · 61 (1) · 63 (1) · 66 (1) · 7 (1) · 8 (1) · 88 (1) · 9 (1)
Width 052:
0 (1) · 10 (1) · 11 (1) · 12 (1) · 13 (1) · 14 (1) · 15 (1) · 16 (1) · 17 (1) · 18 (1) · 25 (1) · 26 (1) · 27 (1) · 28 (1) · 29 (1) · 32 (1) · 34 (1) · 5 (1) · 6 (1) · 7 (1) · 8 (1) · 9 (1)
Superstructure 059:
Substructure 060:
Rebuilt 106:
Scour 113: (Click arrow to add another value)
Future 114:
Future Year 115:
Clearance 116:

Showing below up to 135 results in range #1 to #135.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

T


View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)