Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Owner 022:
City
& Scour 113:
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures
Use the filters below to narrow your results.
'11th Street Canal ' (1) ·
'B-19 Canal / Trib 1 ' (1) ·
'C-1 Canal ' (1) ·
'C-24 Canal ' (1) ·
'C-37 Canal ' (1) ·
'Canal ' (1) ·
'Canal C-46 ' (1) ·
'Canal C-47 ' (1) ·
'Canal C-48 ' (1) ·
'Daytona Canal ' (1) ·
'Halifax Canal ' (1) ·
'Indian River ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'Melbourne Tillman Canal ' (1) ·
'Melbourne-Tillman Canal ' (1) ·
'Misner Branch ' (1) ·
'Reed Canal ' (1) ·
'Turkey Creek ' (1)
'Alta Drive ' (1) ·
'Americana Blvd. ' (1) ·
'AUDUBON CSWY ' (1) ·
'Ballough Street ' (1) ·
'Center Avenue ' (1) ·
'Crosstown Parkway ' (1) ·
'Eldron Blvd ' (1) ·
'Eldron Blvd. ' (1) ·
'Emerson Drive ' (1) ·
'Esplanade Avenue ' (1) ·
'Harrison Street ' (1) ·
'Hurley Blvd ' (1) ·
'Jupiter Blvd. ' (1) ·
'Main Trail ' (1) ·
'Malabar Rd ' (1) ·
'Palm Bay Parkway ' (1) ·
'Port Malabar Bl EB' (1) ·
'Reed Ca Prk Ent Rd' (1)
705100 (1) ·
705906 (1) ·
705909 (1) ·
705910 (1) ·
705914 (1) ·
705916 (1) ·
705917 (1) ·
705918 (1) ·
705919 (1) ·
705924 (1) ·
705953 (1) ·
795000 (1) ·
795503 (1) ·
795521 (1) ·
796000 (1) ·
796413 (1) ·
796500 (1) ·
936451 (1) ·
945274 (1)
'.06mi E OF LANDS END ROAD' (1) ·
'.3 mi South of Mason Ave ' (1) ·
'0.1 mi E of Minton Rd ' (1) ·
'0.1MI E of Riveredge Blvd' (1) ·
'0.26 Mi South of Pace Dr.' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1 mi N of Malabar Road ' (1) ·
'1 mi North of Malabar Rd ' (1) ·
'1 mi S of Malabar Rd ' (1) ·
'1.0Mi. S of Malabar Rd NE' (1) ·
'1.5 Mi S of Malabar Rd. ' (1) ·
'1.6 miles East of SR-507 ' (1) ·
'100 ft E of Minton Road ' (1) ·
'2.0Mi. S of Malabar Rd NE' (1) ·
'200FT N/O Cap Diville Ave' (1) ·
'At Intersection w LPGA BL' (1) ·
'At LPGA Blvd. ' (1) ·
'Intrsect w Reed Canal Rd ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting. (1) ·
N/A (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)